Laserfiche WebLink
3. <br /> r -4(c)' The access road will be of minimum standard commensurate with <br /> 1 • "-the needs of the operation and be rem 7EE/7e1/ <br /> (temporary or permanent) <br /> • <br /> type construction. <br /> (d) Road or trail construction will meet N//9. <br /> -`` (SL-10-30, etc.) <br /> Forest Service Engineering Design standards and specifications. <br /> (e) Construction of the road or trail will not commence until <br /> authorization has been given by the District Ranger. <br /> (f) Road construction may be authorized by this Operating Plan <br /> or by Special Use Permit if it is determined by the <br /> authorized officer that a permit is necessary or desirab'e. <br /> (g) Disposal of salvageable timber and debris in the course of <br /> (I clearing operations will be in accordance with the folLo"ing <br /> agreement SP?6Az 7A/UNG5 AloAA' Mr(ST/.t/C 717X/I- 3 <br /> g0CM/P, (specify plan for disposal) <br /> (h) Construction will be on approved right-of-way location with <br /> maximum sustained grades not to exceed /O Z, or a: <br /> • (percent grade) <br /> otherwise specified in FSH 7709.11 Transportation Engineering <br /> Handbook, 52.1 through 82.4 of FSM 5613 and 7710-12 Road <br /> Design Criteria. <br /> (i) Drainage and erosion control measures that will be provided are: <br /> D/7tg5s '- e../4friL- CO4,671a_ A-S 40., <br /> (specify kind of structures and interval of placement) <br /> (J) Provisions for screening right-of-way and work sites will be <br /> in accordance with the following plan: JfR//UTR)L Exrj/i/6 <br /> (preservation of native <br /> ( LA/ AS 7 R 92, , TF(tr- /4o55/ =-•- <br /> vegetation, leaving tree screens, other provisions for sc:c_airg <br /> the operation). <br />