My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2024-10-03_REVISION - M2003001 (2)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M2003001
>
2024-10-03_REVISION - M2003001 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/3/2024 10:05:31 AM
Creation date
10/3/2024 9:56:07 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2003001
IBM Index Class Name
Revision
Doc Date
10/3/2024
Doc Name
Request For Amendment To Permit
From
BURNCO Colorado, LLC - Civil Resources LLC
To
DRMS
Type & Sequence
AM1
Email Name
NCG
JLE
EL1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
103
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Final grading will create a final topography that is appropriate for the final land use. For <br /> example, grades on the site will be returned to existing (pre-mining)grade. Topsoil will be <br /> uniformly placed and spread on areas disturbed by the mining. The minimum thickness <br /> shall be 6 inches above the surrounding finished grade, consistent with existing topsoil <br /> depths on-site. The topsoil shall be keyed to the underlying and surrounding material by <br /> the use of harrows, rollers or other equipment suitable for the purpose. <br /> In those areas where revegetation is part of the reclamation plan, the Operator will <br /> revegetate the land in such a manner so as to establish a diverse, effective, and long- <br /> lasting vegetative cover that is capable of self-regeneration without continued dependence <br /> on irrigation or fertilizer and is at least equal in extent of cover to the natural vegetation of <br /> the surrounding area. Seed will be drilled and mulched. <br /> The revegetation seeding and plant list on the Reclamation Plan Map contains the <br /> preferred species of grasses, shrubs and trees to be planted. <br /> Seeding will take place once final grading and replacement of topsoil have been <br /> completed. Timing of seeding will be consistent with standard horticultural practice for <br /> dryland applications-generally between late September and the middle of April to ensure <br /> there is adequate moisture for germination. <br /> (e) A plan or schedule indicating how and when reclamation will be implemented. <br /> Include: <br /> i. An estimate of the periods of time which will be required for the various stages or <br /> phases of reclamation. <br /> Please refer to the Timetable for Mining and Reclamation in Section (e) of Exhibit D. <br /> ii. A description of the size and location of each area to be reclaimed during each <br /> phase. <br /> Please refer to the Reclamation Plan Map (Exhibit F). <br /> iii. Outlining the sequence in which each stage or phase of reclamation will be carried <br /> out. <br /> Please refer to the Timetable for Mining and Reclamation in Section (e) of Exhibit D. <br /> (t) A description of: <br /> i. Final grading—maximum anticipated slope gradient or expected ranges thereof; <br /> The finished slopes of the reservoir will be 3 horizontal to 1 vertical. Any area reclaimed to <br /> native grade will match natural topography. <br /> ii. Seeding—types, mixtures, quantities and time of application; <br /> Please refer to the Reclamation Plan Map for the list of plant materials and seeds to be <br /> utilized. The operator will seed during the appropriate season to ensure adequate <br /> moisture for germination and implement weed controls to allow the grasses to successfully <br /> BURNCO COLORADO LLC—Tricycle Amendment-Nissen Mine—MLRB 112 Permit Application <br /> Exhibit E-4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.