Laserfiche WebLink
establish. Additional plantings may be installed once the reservoirs are full of water and <br /> the grasses are established. <br /> iii. Fertilization—types, mixtures, quantities, and time of application; <br /> The type and application rate of fertilizer shall be determined based on a soil test at the <br /> time of final reclamation. <br /> iv. Revegetation—types of trees, shrubs, etc.;and <br /> Please refer to the Reclamation and Landscape Plan Maps for the types, quantities and <br /> location of trees and shrubs to be planted. <br /> v. Topsoiling—specify anticipated minimum depth or range of depths for those areas <br /> where topsoil will be replaced. <br /> Topsoil will be uniformly placed and spread on all areas disturbed by the mining above the <br /> anticipated high water line. The minimum thickness shall be 6 inches above the <br /> surrounding finished grade. <br /> WEED MANAGEMENT PLAN <br /> BURNCO monitors noxious weeds and employs contractors as needed for controlling weeds. <br /> Weeds are preferably controlled by mechanical means(mowing or discing). If necessary weeds <br /> are killed with a contact herbicide by a licensed sprayer. <br /> BURNCO COLORADO LLC—Tricycle Amendment-Nissen Mine—MLRB 112 Permit Application <br /> Exhibit E-5 <br />