My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2024-10-03_REVISION - M2003001 (2)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M2003001
>
2024-10-03_REVISION - M2003001 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/3/2024 10:05:31 AM
Creation date
10/3/2024 9:56:07 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2003001
IBM Index Class Name
Revision
Doc Date
10/3/2024
Doc Name
Request For Amendment To Permit
From
BURNCO Colorado, LLC - Civil Resources LLC
To
DRMS
Type & Sequence
AM1
Email Name
NCG
JLE
EL1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
103
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Section 3.1.7 Groundwater-Specific Requirements: The Operator will comply with the <br /> applicable standards and conditions for classified and unclassified groundwater. <br /> Section 3.1.8 Wildlife: The mining and reclamation plans have been designed to account <br /> for the safety and protection of wildlife on the mine site. The Operator will use concurrent <br /> reclamation methods to minimize the impact on wildlife. The proposed reclamation plan <br /> may improve wildlife habitat. The proposed seed mix and plantings will create improved <br /> cover,foraging, roosting, and nesting areas for wildlife. The water area within the reservoir <br /> will serve as habitat for waterfowl and other bird species and the fringes of the reservoir <br /> will be used by mammal, bird, reptile and amphibian species. Control and/or removal of <br /> noxious and weedy species during the project and the replacement of desirable graminoid, <br /> forb, shrub and tree species during reclamation will result in enhancement of wildlife <br /> habitat on the project site. <br /> Section 3.1.9 Topsoiling: Topsoil shall be removed and segregated from other spoil. <br /> Topsoil stockpiles shall be stored in places and configurations to minimize erosion and <br /> located in areas where disturbance by ongoing mining operations will be minimized. Once <br /> stockpiled, topsoil shall be rehandled as little as possible. Stockpiles that will remain in <br /> place for more than one growing season will receive vegetative cover, as outlined on the <br /> Reclamation Plan Map, as soon as possible to minimize erosion. <br /> Section 3.1.10 Revegetation: In those areas where revegetation is part of the <br /> reclamation plan, the land shall be revegetated in a manner that establishes a diverse, <br /> effective, and long-lasting vegetative cover that is capable of self-regeneration without <br /> continued dependence on irrigation or fertilizer and is at least equal in extent of cover to <br /> the natural vegetation of the surrounding area. The proposed seed-mix and plantings for <br /> reclamation are outlined on the Reclamation Plan map included in Exhibit F of this <br /> application. <br /> Section 3.1.11 Buildings and Structures: Please refer to the enclosed Reclamation Plan <br /> map included in Exhibit F. <br /> Section 3.1.12 Signs and Markers: The Operator will post appropriate signage at the <br /> entrance to the mine site. The permit area will be marked by existing fencing, or proximity <br /> to existing County roads. <br /> (d) Plans for topsoil segregation,preservation and replacement;for stabilization, <br /> compaction and grading of spoil;and for revegetation. <br /> Topsoil will be removed and segregated from other spoil. Topsoil not needed for <br /> reclamation may be sold or removed from the site. For reclamation,topsoil will be <br /> replaced by a scraper and generally graded with a blade. Grading shall be done in a <br /> manner that controls erosion and siltation of the affected land and protects areas outside <br /> the affected land from slides and other damage. In addition, backfilling and grading shall <br /> be completed as soon as feasible after the mining process. <br /> BURNCO COLORADO LLC—Tricycle Amendment-Nissen Mine—MLRB 112 Permit Application <br /> Exhibit E-3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.