Laserfiche WebLink
RPM,Inc.,25049 E.Alder Dr.,Aurora,CO 80016 Phone:(303)854-7499 Email:hlhumphries2(a comcast.net <br /> drilled or backhoe pit and it is not mined through, it will be backfilled with the excavated <br /> material and seeded with the approved seed mix. <br /> (7) Maximum slopes and slope combination shall be compatible with the <br /> configuration of the surrounding conditions and the selected post mining land use: <br /> The proposed post mining land use will be rangeland. The steepest final pit slopes will be <br /> 3H:1 V, or less which are suitable for use by all classes of livestock. <br /> (8) If the Operator's choice of reclamation is for agricultural or horticultural <br /> crops which normally require the use of farm equipment,the Operator shall grade so <br /> that the area can be traversed with farm machinery. <br /> The post mining land use will be rangeland. No lands within the proposed permit boundary <br /> will be reclaimed to either agricultural or horticultural uses. <br /> (9) Placement of inert structural fill imported from off-site: <br /> (a) A narrative that describes the approximate location of the proposed activity. <br /> It is unlikely inert waste material will be imported onto the site. If such a request should <br /> occur, we will submit a Technical Revision in compliance with Rule 3.1.8(9). <br /> (b) the approximate volume of the inert material to be backfilled. <br /> NA. <br /> (c) a signed affidavit certifying that the material is clean and inert, as defined in <br /> Rule 1.1(20); <br /> NA <br /> (10) All mined material to be disposed of within the affected area must be <br /> handled in such a manner so as to prevent any unauthorized release of pollutants to <br /> the surface drainage system: <br /> All mined material will be handled in such a manner so as to prevent any unauthorized <br /> release of pollutants to the surface drainage system. All stockpiled material will be located <br /> and managed so as to avoid any uncontrolled runoff. All storm water runoff from the site <br /> 24 <br />