My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2024-08-07_PERMIT FILE - M2024043
DRMS
>
Day Forward
>
Permit File
>
Minerals
>
M2024043
>
2024-08-07_PERMIT FILE - M2024043
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/8/2024 9:05:10 AM
Creation date
8/8/2024 8:57:33 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2024043
IBM Index Class Name
Permit File
Doc Date
8/7/2024
Doc Name
Application
From
Harry Corkle Construction
To
DRMS
Email Name
BFB
ZTT
EL1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
112
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
RPM,Inc.,25049 E.Alder Dr.,Aurora,CO 80016 Phone:(303)854-7499 Email:hlhumphries2@comcast.net <br /> ✓ Figure 2: <br /> Soils Unit Fo <br /> Soils unit <Soils unit Cyl= < 0-20"loam to day loam <br /> 0 to 15 inches 20 to 60"gravel.sand. <br /> CI clay loam <br /> ' • 3H:I V slope <br /> Unweathered / `4 or less <br /> 44- <br /> bedrock • Seed directly into the <br /> „� Replaced PGM 4.. sandy clay loam <br /> PGM=Plant Growth Material Not to Seale <br /> from soils unit GeD <br /> Note: The above two figures are illustrative and may not be taken as what will occur once <br /> field operations begin and site conditions receive further evaluation. <br /> The pit floor will be final graded at approximately 1.5%or less away from the toe of <br /> any final slopes,toward the outer edge of the mined area. This will ensure no <br /> ponding of rain or snow melt yet prevent excessive site erosion. <br /> (4) The Operator shall establish reasonable timetables consistent with good <br /> mining and reclamation Procedures: <br /> We believe the mining and reclamation phases (timetable) discussed above will reduce the <br /> potential for the reclaimed areas being re-disturbed. <br /> (5) All refuse and acid-forming or toxic producing materials that have been <br /> mined shall be handled and disposed of in a manner that will control unsightliness <br /> and protect the drainage system from pollution: <br /> No refuse,toxic or hazardous materials are to be disposed of at the site. <br /> (6) Any drill or auger holes that are part of the mining operation shall be <br /> plugged in accordance with methods approved by the Division: <br /> There are no drill holes which are part of the mining operation. There are no adits or shafts <br /> associated with this mining operation. However, as part of the on-going mining operation, <br /> auger holes may be drilled to define mining operations prior to entering the next mining <br /> Phase, i.e., auger or backhoe pit sampling in Phase B-1 at the start of Phase A-1, and so on <br /> until the last mining Phase is reached. If there is an area where an auger hole has been <br /> 23 <br />
The URL can be used to link to this page
Your browser does not support the video tag.