My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2024-08-07_PERMIT FILE - M2024043
DRMS
>
Day Forward
>
Permit File
>
Minerals
>
M2024043
>
2024-08-07_PERMIT FILE - M2024043
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/8/2024 9:05:10 AM
Creation date
8/8/2024 8:57:33 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2024043
IBM Index Class Name
Permit File
Doc Date
8/7/2024
Doc Name
Application
From
Harry Corkle Construction
To
DRMS
Email Name
BFB
ZTT
EL1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
112
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
RPM,Inc.,25049 E.Alder Dr.,Aurora,CO 80016 Phone:(303)854-7499 Email:hlhumphries2@comcast.net <br /> In addition, the Operator proposes to use the site for stockpiling specialty products from <br /> other sites Corkel Construction owns. These stockpiles will assist in the availability of <br /> specialty products for sale, especially during winter months, when access to other mine <br /> sites may be limited or impassable. The location of all stockpiles will be in mined out <br /> portions of the active mining area. <br /> Other Equipment <br /> Equipment Type: Notes: <br /> Portable screens for sizing, and stacker And other equipment as may be necessary <br /> for efficient pit and processing operations <br /> Portable crusher Will allow the operation to size product for <br /> a specific use or job. <br /> Scales for truck weights A portable truck scale will be brought on <br /> site as needed. <br /> Processing (crushing and screening) of the excavated material will occur as needed. Any <br /> processing which might occur will be by portable equipment brought onto the site. <br /> Portable processing equipment will be placed in a mined-out portion of the pit. <br /> Topsoil and overburden, if any, will be placed in stockpiles until needed for site <br /> reclamation. The Pre-mine/Mine Plan Map provides the locations of topsoil stockpiles <br /> during the initial phases. Topsoil from Phase A-1 and B-1 will be placed into stockpiles <br /> located on the northeast edge of Phases A-land A-2. Topsoil removed from the <br /> remaining Phases will be placed in the most operationally appropriate designated <br /> locations for topsoil stockpiles. As each new phase is initiated, topsoil will be cycled to a <br /> previous mined and graded phase for phase reclamation. Access roads will be maintained <br /> as needed. <br /> If any overburden and/or crusher fines are generated, the fines will be placed close to the <br /> location requiring backfill in mined out areas of the operation. For example, the post <br /> mine topographic grade difference between Phases A and B. <br /> Topsoil and overburden will be kept separate, not mixed. Topsoil piles will be signed to <br /> keep them separate from overburden. <br /> 12 <br />
The URL can be used to link to this page
Your browser does not support the video tag.