Laserfiche WebLink
RPM,Inc.,25049 E.Alder Dr.,Aurora,CO 80016 Phone:(303)854-7499 Email:hlhumphries2@comcast.net <br /> In addition, the Operator proposes to use the site for stockpiling specialty products from <br /> other sites Corkel Construction owns. These stockpiles will assist in the availability of <br /> specialty products for sale, especially during winter months, when access to other mine <br /> sites may be limited or impassable. The location of all stockpiles will be in mined out <br /> portions of the active mining area. <br /> Other Equipment <br /> Equipment Type: Notes: <br /> Portable screens for sizing, and stacker And other equipment as may be necessary <br /> for efficient pit and processing operations <br /> Portable crusher Will allow the operation to size product for <br /> a specific use or job. <br /> Scales for truck weights A portable truck scale will be brought on <br /> site as needed. <br /> Processing (crushing and screening) of the excavated material will occur as needed. Any <br /> processing which might occur will be by portable equipment brought onto the site. <br /> Portable processing equipment will be placed in a mined-out portion of the pit. <br /> Topsoil and overburden, if any, will be placed in stockpiles until needed for site <br /> reclamation. The Pre-mine/Mine Plan Map provides the locations of topsoil stockpiles <br /> during the initial phases. Topsoil from Phase A-1 and B-1 will be placed into stockpiles <br /> located on the northeast edge of Phases A-land A-2. Topsoil removed from the <br /> remaining Phases will be placed in the most operationally appropriate designated <br /> locations for topsoil stockpiles. As each new phase is initiated, topsoil will be cycled to a <br /> previous mined and graded phase for phase reclamation. Access roads will be maintained <br /> as needed. <br /> If any overburden and/or crusher fines are generated, the fines will be placed close to the <br /> location requiring backfill in mined out areas of the operation. For example, the post <br /> mine topographic grade difference between Phases A and B. <br /> Topsoil and overburden will be kept separate, not mixed. Topsoil piles will be signed to <br /> keep them separate from overburden. <br /> 12 <br />