Laserfiche WebLink
Tmck/Loader Worksheet Cont'd Task#018 Page 2 of 3 <br /> Truck Bed(volume)Basis. <br /> Struck Volume: 21.60 LCY <br /> Heaped Volume: 31.70 LCY <br /> Average Volume: 26.65 LCY <br /> Adjusted Volume: 27.80 LCY <br /> Final Truck Volume Based on Number of Loader Passes: 26.25 LCY <br /> Loading Tool Capacity <br /> Bucket Size Class: NA <br /> Rated Capacity: 7.500 LCY(heaped) <br /> Bucket Fill Factor: 0.875 Loose material- 1"and over (85 -90%)0.875 <br /> Adjusted Capacity: 6.563 LCY <br /> Job Condition Corrections: Site Altitude(ft.): 5300 feet <br /> Truck Loader Source <br /> Altitude Ad': 1.000 1.000 CAT HB <br /> Job Efficiency: 0.830 0.830 CAT HB <br /> Net Correction: 0.830 0.830 <br /> Loading Tool Cycle Time: Number of Loading Tool Passes Required to Fill Truck: 4 passes <br /> Excavators and Front Shovels: <br /> Machine Cycle Time vs.Job Condition Rating: NA <br /> Selected Value within this Basic Rating: NA <br /> Track Loaders—Material Description: <br /> Cycle Time Elements(min.): <br /> Load: NA Maneuver: NA Dump: 0.100 <br /> Wheel and Track Loaders-Unadjusted Basic Loader Cycle Time(load,dump,maneuver): 0.550 minutes <br /> Cycle Time Factors Factor min. Source <br /> Material: Mixed material 0.02 0.020 Cat HB <br /> Stockpile: Conveyor or dozer piled 10 ft.high or less 0.01 0.010 (Cat HB) <br /> Truck Ownership: Common ownership of trucks and loaders-0.04 -0.040 (Cat HB) <br /> Operation: Constant op eration-0.04 -0.040 (Cat HB) <br /> Dump Target: Nominal target 0.00 0.000 (Cat HB) <br /> Net Cycle Time Adjustment: -0.050 minutes <br /> Adjusted Loader Cycle Time: 0.500 minutes <br /> Net Load Time per Truck: 1.600 minutes <br /> Truck Cycle Time: <br /> Truck Exchange Time: 0.60 Minutes Adjusted for site altitude: 0.600 Minutes <br /> Truck Load Time: 1.600 Minutes Adjusted for site altitude: 1.600 Minutes <br /> Truck Maneuver and Dump Time: 1.00 Minutes Adjusted for site altitude: 1.000 Minutes <br /> Truck Travel(Haul&Return)Time: Road Condition:Very hard,smooth,asphalt or concrete,no tire <br /> penetration 1.2 <br /> CIRCES Cost Estimating Software <br />