My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2024-06-27_BONDING - C1981018
DRMS
>
Day Forward
>
Bonding
>
Coal
>
C1981018
>
2024-06-27_BONDING - C1981018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/10/2024 9:41:47 AM
Creation date
7/10/2024 9:39:32 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981018
IBM Index Class Name
Bonding
Doc Date
6/27/2024
Doc Name Note
Findings & Reclamation Cost Estimate
Doc Name
Reclamation Cost Estimate
From
DRMS
To
Blue Mountain Energy, Inc
Type & Sequence
RN8
Email Name
CCW
THM
Media Type
D
Archive
No
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
340
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Tmck/Loader Worksheet Cont'd Task#018 Page 3 of 3 <br /> Haul Route: <br /> Seg# Haul Distance Grade(%) Roll.Res Total Res Velocity Travel <br /> (Ft) (%) (%) (fpm) Time <br /> min <br /> 1 6800.00 3.00 1.20 4.20 2051 3.582 <br /> 2 10000.00 -2.00 1.20 -0.80 3893 2.648 <br /> Haul Time: 6.230 minutes <br /> Return Route: <br /> Seg# Haul Distance Grade(%) Roll.Res Total Res Velocity Travel <br /> (Ft) (%) (%) (fpm) Time <br /> min <br /> 1 10000.00 2.00 1.20 3.20 4074 2.814 <br /> 2 6800.00 -3.00 1.20 -1.80 4254 1.648 <br /> Return Time: 4.462 minutes <br /> Total Truck Cycle Time: 13.892 minutes <br /> Loading Tool unit <br /> Production 715.91 LCY/Hour Adjusted for job efficiency: 594.20 LCY/Hour <br /> Truck Unit Production <br /> 113.37 LCY/Hour Adjusted for job efficiency: 94.10 LCY/Hour <br /> Optimal No.of Trucks: 6 Truck(s) Selected Number of Trucks: 4 Truck(s) <br /> Adjusted hourly truck team production: 376.40 LCY/Hour <br /> Adjusted single truck/loader team production: 376.40 LCY/Hour <br /> Adjusted multiple truck/loader team production: 376.40 LCY/Hour <br /> JOB TIME AND COST <br /> Fleet size: 1 Team(s) Total job time: 128.41 Hours <br /> Unit cost: $2.794 /LCY Total job cost: $135,032 <br /> CIRCES Cost Estimating Software <br />
The URL can be used to link to this page
Your browser does not support the video tag.