Laserfiche WebLink
Page 1 of 3 <br /> TRUCK/LOADER TEAM WORK <br /> Task description: Haul Temporary Refuse from Facilities Area to RP-2/3/4/5a <br /> Site: Deserado Mine Permit Action: RN-8 Permit/Job#: C1981018 <br /> PROJECT IDENTIFICATION <br /> Task#: 018 State: Colorado Abbreviation: None <br /> Date: 6/26/2024 County: Rio Blanco Filename: C018-018 <br /> User: TJ1 <br /> Agency or organization name: DRMS <br /> HOURLY EQUIPMENT COST Shift basis: 1 per day <br /> Equipment Description <br /> Truck Loader Team-Truck: Cat 770D <br /> -Loader: CAT 980H <br /> Support Equipment-Load Area: NA <br /> -Dump Area: NA <br /> Road Maintenance—Motor Grader: NA <br /> -Water Truck: NA <br /> Cost Breakdown: Truck/Loader Team Support E ui ment Maintenance Equipment <br /> Truck Loader Load Area Dump Area Motor Grader Water Truck <br /> %Utilization-machine: 100 75 NA NA NA NA <br /> Ownership cost/hour: $106.52 $61.69 NA NA NA NA <br /> Operating cost/hour: $86.75 $44.19 NA NA NA NA <br /> %Utilization-riper: NA 0 NA NA NA NA <br /> Ripper own.cost/hour: NA $0.00 NA NA NA NA <br /> Ripper op.cost/hour: NA $0.00 NA NA NA NA <br /> Operator cost/hour: $32.98 $40.71 NA NA NA NA <br /> Unit Subtotals: $226.25 $146.59 NA NA NA NA <br /> Number of Units: 4 1 0 0 0 0 <br /> Group Subtotals: Work: $1,051.59 Support: $0.00 Maint: $0.00 <br /> Total work team cost/hour: $1,051.59 <br /> MATERIAL QUANTITIES <br /> Initial volume: 48,333 CCY Swell factor: 1.000 <br /> Loose volume: 48,333 LCY <br /> Source of estimated volume: Division of Reclamation,Mining&Safety <br /> Source of estimated swell factor: Operator Study <br /> Material Purchase Cost: $0.00 <br /> Total Cost: $0.00 <br /> HOURLY PRODUCTION <br /> Truck Capacity: <br /> Truck Payload(weight)Basis: <br /> Material weight: 2,950 Pounds/LCY <br /> Description: Slag-broken <br /> Rated Payload: 82,000 Pounds <br /> Payload Capacity: 27.80 LCY <br /> CIRCES Cost Estimating Software <br />