Laserfiche WebLink
Stipulation No. 27: <br /> UPON APPROVAL OF DEPARTMENTAL ACTION THE OPERATOR WILL SUBMIT <br /> WITHIN 30 DAYS PLANS FOR CONSTRUCTION OF POWERLINES USING APPROVED <br /> GUIDELINES FOR RAPTOR PROTECTION. <br /> Status: This stipulation was satisfied and terminated on September 23, 1981. <br /> Stipulation No. 28: <br /> UPON APPROVAL OF DEPARTMENTAL ACTION THE OPERATOR WILL COMMIT <br /> WITHIN 30 DAYS TO NOT USING PERSISTENT PESTICIDES UNLESS APPROVED BY <br /> THE REGULATORY AUTHORITY AND TO FENCE ANY PONDS THAT CONTAIN <br /> TOXIC MATERIALS. <br /> Status: This stipulation was satisfied and terminated on August 27, 1981. <br /> Stipulation No.29: <br /> A STATE AIR QUALITY PERMIT IS REQUIRED BEFORE CONSTRUCTION AND <br /> OPERATION CAN BEGIN. <br /> Status: This stipulation was satisfied and terminated on August 27, 1981. <br /> Stipulation No. 30: <br /> WITHIN 30 DAYS OF ACCEPTANCE OF APPROVAL OF THE MINE PLAN, THE <br /> APPLICANT SHALL ENSURE THAT THEIR CULTURAL RESOURCE CONTRACTOR <br /> HAS SUFFICIENTLY DOCUMENTED THE 17 "POTENTIALLY" ELIGIBLE SITES SO <br /> THAT OSM MAY SUBMIT A REQUEST FOR ELIGIBILITY OR NON-ELIGIBILITY <br /> CONCURRENCE FOR THESE SITES TO THE COLORADO SHPO. THE INITIAL <br /> DOCUMENTATION ON THE ELIGIBILITY TEST PROGRAM MAY BE IN DRAFT FORM <br /> AND CONCERN ITSELF ONLY WITH THE QUESTION OF ELIGIBILITY. A BRIEF <br /> FINAL REPORT ON THE TESTING PROGRAM SHOULD BE SUBMITTED WITHIN 90 <br /> DAYS. <br /> Status: This stipulation was satisfied and terminated on September 23, 1981. <br /> Stipulation No. 31: <br /> FOLLOWING SHPO REVIEW AND CONCURRENCE WITH THE ELIGIBILITY <br /> ASSESSMENTS, OSM WILL PROVIDE WESTERN FUELS WITH A LIST OF SITES THAT <br /> HAVE BEEN DETERMINED ELIGIBLE. WITHIN 60 DAYS OF RECEIPT OF THIS <br /> ELIGIBILITY LIST WESTERN FUELS WILL SUBMIT A SITE-SPECIFIC MITIGATION <br /> PLAN FOR THOSE ELIGIBLE SITES FOR REGULATORY APPROVAL. <br /> xiv <br />