Laserfiche WebLink
Status: This stipulation was satisfied and terminated on September 25, 1981. <br /> Stipulation No. 32: <br /> THE OPERATOR SHALL IMPLEMENT THE MITIGATION PROCEDURES SPECIFIC IN <br /> STIPULATION NO. 2 IN STRICT ADHERENCE WITH THE OBJECTIVES,METHODS, <br /> AND TECHNIQUES SPECIFIED IN THE MITIGATION PROPOSAL APPROVED BY THE <br /> REGULATORY AUTHORITY AND THE COLORADO SHPO. THE PLAN SHALL BE <br /> IMPLEMENTED IN ACCORDANCE WITH PART II OF THE ADVISORY COUNCIL'S <br /> "GUIDELINES" AND ANY DEVIATIONS FROM THE APPROVED PROPOSAL MUST <br /> FIRST BE SUBMITTED TO THE REGULATORY AUTHORITY, FOR APPROVAL. <br /> Status: This stipulation was satisfied and terminated on May 9, 1986. <br /> Stipulation No. 33: <br /> UNTIL FINAL ELIGIBILITY CONCURRENCE AND A DETERMINATION OF "NO <br /> EFFECT", "NO ADVERSE EFFECT" IS OBTAINED FROM THE COLORADO SHPO NO <br /> WORK WILL BE PERMITTED IN AREAS WHICH MIGHT ENDANGER THE INTEGRITY <br /> OF THE FOLLOWING SITES: 5RB854, 855, 856, 860, 906, 907, 921, 1008, 1029, 1047, 1051, <br /> 1148, 1160, 1170, 1171, 1175, 1176, 232, 491 858, 859, 903, 922, 1059. ONCE <br /> CONCURRENCE IS ACHIEVED, OSM WILL NOTIFY WESTERN FUELS AS TO THOSE <br /> AREAS THAT STILL REQUIRE PROTECTION UNTIL MITIGATION OF IMPACTS HAS <br /> BEEN COMPLETED. <br /> Status: This stipulation was satisfied and terminated on May 9, 1986. <br /> Stipulation No. 34: <br /> IF, DURING THE COURSE OF MINING OPERATIONS, PREVIOUSLY UNIDENTIFIED <br /> CULTURAL RESOURCES ARE DISCOVERED, THE APPLICANT WILL INSURE THAT <br /> THE SITE IS NOT DISTURBED AND SHALL NOTIFY THE REGULATORY AUTHORITY. <br /> THE OPERATOR SHALL INSURE THAT THE RESOURCE(S) IS PROPERLY <br /> EVALUATED IN TERMS OF THE NATIONAL REGISTER OF HISTORIC PLACES <br /> ELIGIBILTY CRITERIA (36 CFR 60.6). <br /> Status: This stipulation was satisfied and terminated on May 9, 1986. <br /> Stipulation No. 35: <br /> PRIOR TO ISSUANCE OF A PERMIT TO CONDUCT MINING OPERATIONS, THE <br /> APPLICANT MUST SUBMIT A MAP SHOWING EACH AREA OF LAND ON THE <br /> PROPOSED PERMIT AREA FOR WHICH A PERFORMANCE BOND WILL BE <br /> SUBMITTED, SUBMIT A DESCRIPTION OF ACTIVITIES TO OCCUR ON THOSE AREAS <br /> OF LAND,AND IDENTIFY THE AMOUNT OF PERFORMANCE BOND TO COVER <br /> RECLAMATION COSTS ASSOCIATED WITH EACH AREA OF LAND. NOTE: THIS IS <br /> xv <br />