My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2024-06-27_BONDING - C1981018
DRMS
>
Day Forward
>
Bonding
>
Coal
>
C1981018
>
2024-06-27_BONDING - C1981018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/10/2024 9:41:47 AM
Creation date
7/10/2024 9:39:32 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981018
IBM Index Class Name
Bonding
Doc Date
6/27/2024
Doc Name Note
Findings & Reclamation Cost Estimate
Doc Name
Reclamation Cost Estimate
From
DRMS
To
Blue Mountain Energy, Inc
Type & Sequence
RN8
Email Name
CCW
THM
Media Type
D
Archive
No
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
340
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
THE APPLICANT SHALL OBTAIN RIGHTS-OF-WAY FROM BLM PRIOR TO THE <br /> CONSTRUCTION OF OFF LEASE ROADS, TRANSMISSION LINES, WATER LINES AND <br /> FACILITIES AND FOR THIRD PARTY FACILITIES ON THE LEASES. <br /> Status: This stipulation was satisfied and terminated on August 27, 1981. <br /> Stipulation No. 24: <br /> COMPANY HAS NOT SUBMITTED ADEQUATE INFORMATION ON MULE DEER AND <br /> ANTELOPE MIGRATION PROBLEMS THROUGH THE AREA OF DISTURBANCE. IN <br /> ORDER TO DEVELOP PROPER MITIGATION PLANS FOR THE PROTECTION OF THE <br /> INTEGRITY OF MIGRATION ROUTES BRIEFLY IDENTIFIED IN BLM'S FINAL EIS ON <br /> THE MOON LAKE PROJECT, THE FOLLOWING STIPULATION HAS BEEN <br /> DEVELOPED: THE APPLICANT MUST SUBMIT TO THE REGULATORY AUTHORITY <br /> THE COMPLETE STUDY RESULTS FOR MULE DEER AND ANTELOPE MIGRATION <br /> CONSIDERATIONS WITHIN 30 DAYS OF APPROVAL <br /> Status: This stipulation was satisfied and terminated on September 23, 1981. <br /> Stipulation No. 25: <br /> DUE TO POOR WEATHER CONDITIONS THE APPLICANT'S SURVEY FOR SAGE <br /> GROUSE LEK ACTIVITIES WAS UNSUCCESSFUL. A SURVEY IS BEING CONDUCTED <br /> IN SPRING OF 1981 TO DETERMINE IF ANY LEKS DO OCCUR IN THE AREA TO BE <br /> DISTURBED. THEREFORE, BEFORE ANY EVALUATION CAN BE INITIATED THAT <br /> SURVEY MUST BE SUBMITTED. WITHIN 30 DAYS OF THE MINE PLAN APPROVAL, <br /> THE APPLICANT SHALL SUBMIT TO THE REGULATORY AUTHORITY THE RESULTS <br /> OF THE LEK SURVEY AND WHAT MITIGATION PROCEDURES WILL BE USED TO <br /> MINIMIZE IMPACTS TO SAGE GROUSE AND THEIR HABITATS. <br /> Status: This stipulation was satisfied and terminated on September 23, 1981. <br /> Stipulation No. 26: <br /> ADEQUATE PROTECTION FOR ACTIVE GOLDEN EAGLE NESTS ADJACENT TO THE <br /> MINING SITE MUST BE PROVIDED. THEREFORE, THE FOLLOWING DESCRIBED <br /> LANDS ARE CLASSIFIED AS UNSUITABLE FOR SURFACE DISTURBANCE AND <br /> OCCUPANCY. PERIODIC ACTIVITY DURING THE NON-NESTING SEASON(JUNE 1 - <br /> FEBRUARY 28) WITHIN THE BUFFER ZONE CAN BE APPROVED ON A CASE BY <br /> CASE BASIS: FEDERAL LEASE D-047201, T2N, R10W, 6TH PM, SEC. 3, S 1/2 SE1/4, <br /> SEC. 10,NE 1/4 NE 1/4; FEDERAL LEASE C-02373, T2N, R10W, 6TH PM SEC. 3, E 1/2 <br /> SE/4 SW 1/4. <br /> Status: This stipulation was satisfied and terminated on August 27, 1981. <br /> xiii <br />
The URL can be used to link to this page
Your browser does not support the video tag.