My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2024-05-06_REVISION - M1986123 (2)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1986123
>
2024-05-06_REVISION - M1986123 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/9/2024 12:50:00 PM
Creation date
5/9/2024 12:24:13 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1986123
IBM Index Class Name
Revision
Doc Date
5/6/2024
Doc Name Note
TOC and Exhibits A-S
Doc Name
Adequacy Review Response
From
Coulson Excvating Company, Inc.
To
DRMS
Type & Sequence
AM1
Email Name
JPL
JLE
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
26
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
6.4.5 Exhibit E - Reclamation Plan <br /> Description of the Type of Reclamation <br /> Reclamation will include: <br /> • Removal of floodplain sand and gravel from the northern portion of <br /> the site to expose topsoil underneath. That material will be used to <br /> backfill Ponds 1 &2 <br /> • Backfilling Ponds 1 & 2 with previously stockpiled overburden on <br /> the western portion of the site <br /> • Topsoil replacement and revegetation of Pond backfill areas <br /> • Revegetation of remaining exposed soil areas <br /> Reclamation Earthwork Sequence and Timetable <br /> Reclamation earthwork will consist of backfilling Pond 1 and Pond 2 with onsite <br /> materials and materials imported from the adjacent Stroh Pit to the east as <br /> follows: <br /> 1) Backfill Pond 1 with 6"-8" of sand and gravel deposited by the 2013 flood <br /> on the surface of ground north of Pond 1 as well as with overburden and <br /> topsoil located in a stockpile in the western area of the site. Total Volume <br /> = -13,000 yd3 <br /> 2) Backfill Pond 2 with materials imported from the Stroh Pit in the amount of <br /> approximately 29,000 yd3 <br /> The sequence of reclamation activities will occur in the order above. The <br /> timetable to complete is approximately 7 years. <br /> Kirtright Pit(M1986-123) Amendment Application <br /> Specific Exhibits <br /> Page 5 of 26 <br />