Laserfiche WebLink
6.4.4 Exhibit D — Mining Plan <br /> Mining of construction materials has been completed. Excavation of materials <br /> stockpiled and deposited by the 2013 flood will occur for the purpose of <br /> backfilling Ponds 1 and a portion of Pond 2. In addition, the site will be used to <br /> convey, stockpile and haul pit run from the Stroh Pit, which is adjoining to the <br /> east. Exhibit C-2 Mining Plan Map shows the extent of these activities. <br /> Kirtright Pit(M1986-123) Amendment Application <br /> Specific Exhibits <br /> Page 4 of 26 <br />