My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2024-04-08_PERMIT FILE - M2024012
DRMS
>
Day Forward
>
Permit File
>
Minerals
>
M2024012
>
2024-04-08_PERMIT FILE - M2024012
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/9/2024 10:47:12 AM
Creation date
4/9/2024 10:23:22 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2024012
IBM Index Class Name
Permit File
Doc Date
4/8/2024
Doc Name
Application
From
W.W. Clyde & CO
To
DRMS
Email Name
ACY
THM
EL1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
153
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
8) Will groundwater be encountered and/or surface water intercepted or disturbed(check one): <br /> (LJ)Yes or(n) No. <br /> a. If yes, please describe: <br /> 9) (Optional) Please provide additional information about the Mining Plan: <br /> The borrow area will be excavated by benching slopes a depth of 5 - 10 feet. No groundwater will <br /> be exposed during the mining. The mining excavation will then be graded to a 3.2:1 reclaimed <br /> slope and excess materials will be used to backfill prior to placing topsoil. The limits of mining are <br /> shown on the Exhibit E - Mining Plan map. <br /> Overburden and topsoil will be stockpiled as shown on the mining plan map. I opsoil trom the <br /> topsoil stockpile will be used to reclaim the site. The reclaimed slopes and disturbed area where <br /> the topsoil stockpile is removed will be seeded as pail of the reclarrraliorr of the site. <br /> The sccd mix and PLS per acre rates to be used to reclaim the site arc shown in Exhibit D <br /> Reclamation Plan, Section 7.d - Zone 3- Pinyon-juniper(Sagebrush Steppe, Western Plateau). <br /> ThP application rates shown will be douhler because the seed will be broadcast <br /> The primary commodity to be mined is fill dirt and backfill material to be used for construction of SH <br /> 13 improvements. <br />
The URL can be used to link to this page
Your browser does not support the video tag.