My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2024-04-08_PERMIT FILE - M2024012
DRMS
>
Day Forward
>
Permit File
>
Minerals
>
M2024012
>
2024-04-08_PERMIT FILE - M2024012
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/9/2024 10:47:12 AM
Creation date
4/9/2024 10:23:22 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2024012
IBM Index Class Name
Permit File
Doc Date
4/8/2024
Doc Name
Application
From
W.W. Clyde & CO
To
DRMS
Email Name
ACY
THM
EL1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
153
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EXHIBIT D -Reclamation Plan <br /> Rule 6.3.4 <br /> The purpose of the Reclamation Plan is to describe the timing, procedures, criteria and materials that will <br /> be used to reclaim the affected land to the proposed future land use. This plan must be correlated to <br /> Exhibit E - Map. <br /> 1) Primary future(Post-mining) land use(check one): <br /> n Cropland (CR) ❑ Pastureland (PL) ❑✓ General Agriculture (GA) <br /> ❑ Rangeland(RL) ❑ Forestry (FR) ❑ Wildlife Habitat(WL) ** <br /> n Residential(RS) n Recreation(RC) n Industrial/Commercial(IC) <br /> ❑ Developed Water Resource (WR) <br /> **Note: The Colorado Parks & Wildlife (CPW) must be consulted where wildlife use is the <br /> proposed future land use. <br /> 2) Please provide a general description of how the mined area will be reclaimed: <br /> The mined area will be graded to a 3.2:1 slope and then topsoil will be placed and roughened <br /> to prevent erosion. The area will then be seeded and mulched. <br /> 3) Specify which ponds, streams, roads and buildings, if any, will remain after reclamation. <br /> These features must be shown on the Exhibit E- Map: <br /> The existing access road and new access road will be left in place. <br /> Note: if ponds are a part of the Reclamation Plan, slopes from 5 vertical feet above to 10 <br /> vertical feet below the expected average water level cannot be steeper than 3H:1V; remaining <br /> slope lengths may not be steeper than 2H:1V(see example sketch below). <br /> 5' <br /> 10' 1 <br /> 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.