Laserfiche WebLink
EXHIBIT D -Reclamation Plan <br /> Rule 6.3.4 <br /> The purpose of the Reclamation Plan is to describe the timing, procedures, criteria and materials that will <br /> be used to reclaim the affected land to the proposed future land use. This plan must be correlated to <br /> Exhibit E - Map. <br /> 1) Primary future(Post-mining) land use(check one): <br /> n Cropland (CR) ❑ Pastureland (PL) ❑✓ General Agriculture (GA) <br /> ❑ Rangeland(RL) ❑ Forestry (FR) ❑ Wildlife Habitat(WL) ** <br /> n Residential(RS) n Recreation(RC) n Industrial/Commercial(IC) <br /> ❑ Developed Water Resource (WR) <br /> **Note: The Colorado Parks & Wildlife (CPW) must be consulted where wildlife use is the <br /> proposed future land use. <br /> 2) Please provide a general description of how the mined area will be reclaimed: <br /> The mined area will be graded to a 3.2:1 slope and then topsoil will be placed and roughened <br /> to prevent erosion. The area will then be seeded and mulched. <br /> 3) Specify which ponds, streams, roads and buildings, if any, will remain after reclamation. <br /> These features must be shown on the Exhibit E- Map: <br /> The existing access road and new access road will be left in place. <br /> Note: if ponds are a part of the Reclamation Plan, slopes from 5 vertical feet above to 10 <br /> vertical feet below the expected average water level cannot be steeper than 3H:1V; remaining <br /> slope lengths may not be steeper than 2H:1V(see example sketch below). <br /> 5' <br /> 10' 1 <br /> 3 <br />