Laserfiche WebLink
RN8 2.05.3-48 Revised 11/16/23 <br />Table 60 <br />TOPSOIL REPLACEMENT <br />NO. 9 PORTAL AND GENERAL AREA, AND (1)WASTE DISPOSAL PILE <br />____________________________________________________________________________ <br /> Topsoil Stockpiles Topsoil to be Replaced <br /> Location CY Stored Area Acreage Depth <br />__________________________________________________________________________________________________________________________ <br /> <br />NE of Refuse Pile 6,687 Refuse Pile - Used 27.0 6-12"(2) <br />NW of Refuse Pile 12,246 Refuse Pile - Used <br />E of Refuse Pile 100,308 (Subsoil) Refuse Pile – Used <br /> <br />No. 9 Berm 41,000 No. 9 Portal – Used 33.6 6-12" <br /> <br />NE of Pond 9-P6 150 General Pond Area <br />NW of Pond 9-P4 150 General Pond Area <br />S of Pond 9-P5 150 General Pond Area <br /> <br />NOTES <br /> <br />* General Area includes all the disturbed area including sediment control systems. <br /> <br />(1) Includes Electrician's Shop <br /> <br />(2) 43,560 cy of material needed to provide 1 foot of material over refuse. 18,933 cy available from <br />topsoil stockpile, remainder of plant growth material will be obtained from sub-soil stockpile east of <br />refuse pile. <br /> <br /> Highlighted values reflect soil materials which have been removed from stockpile and replaced on <br />reclaimed areas <br /> <br />Any overburden or soil materials to be used will be sampled for fertility and amendments added, as indicated <br />and appropriate. <br /> <br />