Laserfiche WebLink
RN8 2.05.3-47 Revised 11/16/23 <br />Table 59 <br />TOPSOIL REPLACEMENT <br />NO. 5A PORTAL AND GENERAL AREA*, OLD SHOP, AND CARPENTER SHOP <br />______________________________________________________________________________ <br />Topsoil Stockpiles Topsoil to be Replaced <br /> Location CY Stored Area Acreage Depth <br />_____________________________________________________________________________________________________________________________ <br /> <br />5A Portal <br /> (1) 0 5A Portal - RECLAIMED 22 *1 <br /> (1) 0 Ponds 5A-P2&3 4.5 *1 <br /> <br />Adjacent to SH-P1 180* SH-P1 9 *2 <br />Adjacent to SH-P2 240* SH-P2 *3 <br />Temporary Office 39 <br /> <br />NOTES <br /> <br />* General Area includes all the disturbed area including sediment control systems. <br /> <br /> Highlighted values reflect soil materials which have been removed from stockpile and replaced on <br />reclaimed areas <br /> <br />*1 Overburden will be used as a plant growth media as per the requirements established during the <br />overburden testing (6”). <br /> <br />*2 The salvaged topsoil will be redistributed over the pond areas, and overburden will be used as the <br />plant growth media for the remainder of the site. <br /> <br />*3 The topsoil was salvaged from the eastern end of the parking lot and will be redistributed to a depth <br />of 6" over this area. The existing soils will be used as a plant growth media for the remainder of <br />the area. <br /> <br />Any overburden or soil materials to be used will be sampled for fertility and amendments added, as indicated <br />and appropriate. <br /> <br />