Laserfiche WebLink
RN8 2.05.3-46 Revised 11/16/23 <br />Table 58 <br />TOPSOIL REPLACEMENT - NO. 5 PORTAL AND GENERAL AREA* <br /> <br />_______________________________________________________________________________ <br /> Topsoil Stockpiles Topsoil to be Replaced <br /> Location CY Stored Area Acreage Depth <br />___________________________________________________________________________________________________________________________ <br />__ <br /> <br />Adjacent to HR-P1 1,093 No. 5 Mine Portal Area 12.1 6-12" <br /> <br />Adjacent to HR-P2 344 No. 5 Mine Sediment 2.8 6-12" <br /> Control System <br /> <br />Adjacent to HR-P3 164 No. 5 Mine Dewatering 3.7 6-12" <br /> System <br /> <br />Adjacent to 5-P4 500 Replaced - railroad 2.4 6-12" <br />Adjacent to 5-P5 8,089 Replaced - railroad <br /> <br />Adjacent to 5-P2 86 Replaced – Facilities area Uniform Coverage <br />NW of Silo 1,290 Replaced – Facilities area <br />SW of Silo 12,888 Replaced – Facilities area <br />S of Warehouse 1,352 Replaced – Facilities area <br /> <br />NOTES <br /> <br />* General Area includes all the disturbed area in the Williams Fork River Valley, including <br />sediment control systems, dewatering system, and railroad. <br /> <br />Highlighted values reflect soil materials which have been removed from stockpile and replaced on reclaimed <br />areas <br /> <br />Any overburden or soil materials to be used will be sampled for fertility and amendments added, as indicated <br />and appropriate. <br /> <br /> <br />