Laserfiche WebLink
RN8 2.05.3-49 Revised 11/16/23 <br />Table 61 <br />TOPSOIL REPLACEMENT <br />NO. 9A PORTAL AND GENERAL AREA <br />____________________________________________________________________________ <br />Topsoil Stockpiles Topsoil to be Replaced <br /> Location CY Stored Area Acreage Depth <br />__________________________________________________________________________________________________________________________ <br /> <br />N of 9A Portal 22,600 9A Portal – Used 23.1 6-9" <br /> <br />NOTES <br /> <br />* General Area includes all the disturbed area including sediment control systems. <br /> <br /> Highlighted values reflect soil materials which have been removed from stockpile and replaced on <br />reclaimed areas <br /> <br />Any overburden or soil materials to be used will be sampled for fertility and amendments added, as indicated <br />and appropriate. <br />