My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2024-02-01_REVISION - M1973021 (2)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1973021
>
2024-02-01_REVISION - M1973021 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/1/2024 12:43:10 PM
Creation date
2/1/2024 11:22:34 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1973021
IBM Index Class Name
Revision
Doc Date
2/1/2024
Doc Name Note
Adequacy Response 1
Doc Name
Adequacy Review Response
From
Holcim/HDR
To
DRMS
Type & Sequence
TR9
Archive
No
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1813
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Ninth Technical Revision (TR09) to Permit M-1973-021, Holcim- WCR, Inc. Morrison Quarry <br /> <br /> <br /> <br />January 2024 | 20 <br />MW-2019- <br />03/ <br />316739 <br />West (hydraulically <br />upgradient) of the <br />Central Quarry <br />Discontinue <br />monitoring. Abandon <br />well. <br />6,689.6 290.0 6,399.6 <br />5.2 Surface Water and Stormwater <br />This South Quarry drainage area includes: <br />· South Quarry West Wall: Per the updated drainage report, runoff from the South Quarry <br />upper highwall and benches will be captured in a diversion channel that will direct flows <br />away from the highwall. The diversion will flow north parallel to the highwall along an <br />inactive bench at a mild slope and then travel down a steeper chute slope, referred to as the <br />diversion channel chute, to outlet to the South Quarry drainage area along the installed west <br />quarry haul road. <br />· West Quarry and West Quarry Haul Road: Runoff from the West Quarry will be conveyed <br />into the South Quarry via the West Quarry Haul Road drainage structures. Water is <br />conveyed via West Quarry Haul Road where it discharges to Outfall 003 or collects in the <br />low point of the South Quarry during high flow events. <br />· During mining, runoff that collects at the low point of the South Quarry is allowed to either <br />infiltrate or is pumped to Outfall 006 within 72 hours. <br />· Once mining and reclamation of the South Quarry are complete, the South Quarry final <br />grading will be at a 3% slope southwest to northeast to convey stormwater to Outfall 003 for <br />discharge. <br />Outfall 003 discharges to Unnamed Drainage #1 and Outfall 006 discharges to Unnamed Drainage <br />#2, both downstream of the Quarry. Both of the drainages flow into Turkey Creek, approximately 1 <br />mile downstream of the outfall locations. <br />
The URL can be used to link to this page
Your browser does not support the video tag.