Laserfiche WebLink
Ninth Technical Revision (TR09) to Permit M-1973-021, Holcim- WCR, Inc. Morrison Quarry <br /> <br /> <br /> <br />January 2024 | 19 <br />5 Exhibit G - Water Information <br />This section summarizes changes to groundwater and stormwater/surface water management in the <br />South Quarry. <br />5.1 Groundwater <br />As discussed in Section 3.2, Groundwater Management subsection, groundwater water level <br />measurements in and around the proposed Satellite Pit location identify groundwater present <br />between El. 6,588 and El, 6600. These water levels indicate the need for groundwater management <br />as the proposed Satellite South Pit is advanced. To manage this anticipated groundwater, as mining <br />proceeds in the South Quarry, mining operations will proceed from east to west, creating a low point <br />on the east side of the pit, south of the spur road. A sump will be maintained in this location of the pit <br />where accumulated groundwater will be pumped and either discharged to Outfall 006 (directly east <br />of the proposed sump location) or will be stored on site and either used to support operations or <br />evaporated. Holcim is preparing a SWSP and plan for augmentation to replace depletions from <br />evaporation or potential on-site use and a well permit to expose groundwater, which will be filed in <br />2024. <br />Per AM07, the three monitoring wells surrounding the South Quarry, summarized in the table below, <br />were installed and monitored monthly to evaluate water levels and determine if groundwater would <br />be encountered. Since a plan for augmentation, SWSP, and well permit applications are under <br />development, the monitoring wells around the South Quarry are no longer needed to determine if <br />groundwater has been encountered. To streamline monitoring requirements, the monitoring wells <br />located side- and up-gradient of the South Quarry, MW-2019-02 and MW-2019-03, will be <br />abandoned. MW-2019-01 will continue to be monitored quarterly until Holcim receives an approved <br />augmentation plan. MW-2019-02 and MW-2019-03 will be abandoned in 2024 and well <br />abandonment reports (State of Colorado Form GWS-09) will be completed and submitted to the <br />Division of Water Resources within 60 days of plugging and sealing the well/hole. <br />Well ID #/ <br />Permit # <br />Location TR09 modification Well Information <br />Top <br />Elevation <br />Depth <br />(ft) <br />Bottom <br />Elevation <br />MW-2019- <br />01/ <br />316737 <br />East (hydraulically <br />downgradient) of <br />the South Quarry <br />Continue <br />groundwater level <br />monitoring. Reduce <br />to quarterly <br />monitoring <br />frequency. <br />6,646.0 246.4 6,339.6 <br />MW-2019- <br />02/ <br />316738 <br />South (hydraulically <br />side gradient) of the <br />South Quarry <br />Discontinue <br />monitoring. Abandon <br />well. <br />6,670.0 274.3 6,395.7