Laserfiche WebLink
Ninth Technical Revision (TR09) to Permit M-1973-021, Holcim- WCR, Inc. Morrison Quarry <br /> <br /> <br /> <br />January 2024 | 21 <br />6 Exhibit L – Reclamation Costs <br />This section contains costs associated with reclaiming the Satellite South Pit at the Morrison Quarry. <br />Reclamation is anticipated to proceed after Satellite South Pit mining is complete. A plan view <br />showing the reclamation scenario is shown in Exhibit F-1. Error! Reference source not found. <br />summarizes Satellite South Pit reclamation costs. <br />Table 3. Satellite South Pit (<El. 6,600) Reclamation Costs Detail <br />Direct Reclamation Costs <br />Item Description Unit Quantity Unit Price Total Cost <br />1.0 Mobilization/Demobilization % 1 10% $1,618,282.89 <br />2.0 Mined Areas Direct Reclamation Costs – Earthmoving1 <br />2.1 Drill and Blasting LCY 1,854,182 $1.16 $2,143,434.80 <br />2.2 Fill and Compaction LCY 1854182 $7.47 $13,859,394.05 <br />2.3 Compaction Testing Day 48 $1,250 $60,000 <br />3.0 Dewatering Mo 16 $7,500 $120,000 <br />Mined Area Total Earthmoving Cost $16,182,828.85 <br />Indirect Reclamation Costs <br />4.0 Performance Bond % $16,182,828.85 1.50% $242,742.43 <br />5.0 Administration % $16,182,828.85 1.50% $242,742.43 <br />Total (includes 2.95% escalation) $18,826,051.20 <br />1Due to proposed Satellite South Pit backfill being completed to El. 6,600, survey, erosion control, final grading, revegetation, and <br />dewatering cost are not included in this estimate. Costs for these services were included in the reclamation bond <br />calculated in AM07 (refer to Table L-7).