Ninth Technical Revision (TR09) to Permit M-1973-021, Holcim- WCR, Inc. Morrison Quarry <br /> <br /> <br /> <br />January 2024 | 11 <br />Schedule <br />It is anticipated that mining will be completed in the Satellite South Pit in early 2027. At this point, if <br />additional mining is not anticipated or approved in a permit modification, reclamation work will <br />commence. It is anticipated that this reclamation work, focused on backfill and compaction up to El. <br />6,600, will take up to 16 months to complete. <br />3.3 Planned Satellite South Pit Reclamation Scope of Work <br />Item 1.0 Mobilization/Demobilization <br />This item includes all costs necessary and incidental to move equipment and supplies onto the <br />project area; move equipment within the project area during the course of the project; and fulfill any <br />other requirements necessary for the successful completion of this project. The operator will <br />maintain such temporary works and equipment throughout the period of construction. This item also <br />includes all labor, equipment, and costs associated with demobilization and clean-up of the project <br />site following completion of the project. For the scope of work proposed, Holcim assumes that the <br />following equipment will be mobilized to the site (this equipment list is the equipment currently used <br />by Holcim for production and reclamation activities at the Quarry): <br />· (1) Surface Drill (Atlas Copco D65-T4F or equivalent) <br />· (1) Front-end wheel loaders with a 15-cubic-yard bucket (Caterpillar 992 or equivalent) <br />· (1) Bulldozer (Caterpillar D9 or equivalent) <br />· (3) Rigid 100-ton haul trucks (Caterpillar 777 or equivalent) <br />· (1) Water Truck (Caterpillar 725C2 Modified - 10,000 gallons or equivalent) <br />· (2) 6” Garmen-Rupp PA Series Pump (Model PA6c60-40450/51 or equivalent) <br />This equipment will most likely be provided by the operator. The loading, hauling, and grading <br />equipment can also be rented from Wagner Rents – Caterpillar Rental, 17800 E. 22nd Avenue, <br />Aurora, Colorado 80011. The drill and blasting equipment and services can be procured from <br />qualified contractors in the area. Costs for reclamation assumed loading, hauling, and grading <br />equipment rental, dewatering pump purchase, and procurement of a qualified drilling and blasting <br />contractor. <br />Item 2.1 Mined Area Earthwork: Drilling and Blasting <br />As described in Section 3.2, fill material will need to be generated on-site to provide material to <br />complete the Satellite South Pit backfill activities. This material will be generated in the South <br />Quarry, below the West Quarry, in the footprint approved under AM07 and is anticipated to be <br />completed concurrent with Satellite South Pit reclamation activities. Drilling and blasting will be <br />completed using drill and blast methods currently employed at the site (refer to AM05 for drill and <br />blasting methods). Based on current drilling and blasting methods, the material generated will be no <br />greater than 30 inches to support direct transport to the Satellite South Pit location for placement