My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2024-02-01_REVISION - M1973021 (2)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1973021
>
2024-02-01_REVISION - M1973021 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/1/2024 12:43:10 PM
Creation date
2/1/2024 11:22:34 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1973021
IBM Index Class Name
Revision
Doc Date
2/1/2024
Doc Name Note
Adequacy Response 1
Doc Name
Adequacy Review Response
From
Holcim/HDR
To
DRMS
Type & Sequence
TR9
Archive
No
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1813
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Ninth Technical Revision (TR09) to Permit M-1973-021, Holcim- WCR, Inc. Morrison Quarry <br /> <br /> <br /> <br />January 2024 | 11 <br />Schedule <br />It is anticipated that mining will be completed in the Satellite South Pit in early 2027. At this point, if <br />additional mining is not anticipated or approved in a permit modification, reclamation work will <br />commence. It is anticipated that this reclamation work, focused on backfill and compaction up to El. <br />6,600, will take up to 16 months to complete. <br />3.3 Planned Satellite South Pit Reclamation Scope of Work <br />Item 1.0 Mobilization/Demobilization <br />This item includes all costs necessary and incidental to move equipment and supplies onto the <br />project area; move equipment within the project area during the course of the project; and fulfill any <br />other requirements necessary for the successful completion of this project. The operator will <br />maintain such temporary works and equipment throughout the period of construction. This item also <br />includes all labor, equipment, and costs associated with demobilization and clean-up of the project <br />site following completion of the project. For the scope of work proposed, Holcim assumes that the <br />following equipment will be mobilized to the site (this equipment list is the equipment currently used <br />by Holcim for production and reclamation activities at the Quarry): <br />· (1) Surface Drill (Atlas Copco D65-T4F or equivalent) <br />· (1) Front-end wheel loaders with a 15-cubic-yard bucket (Caterpillar 992 or equivalent) <br />· (1) Bulldozer (Caterpillar D9 or equivalent) <br />· (3) Rigid 100-ton haul trucks (Caterpillar 777 or equivalent) <br />· (1) Water Truck (Caterpillar 725C2 Modified - 10,000 gallons or equivalent) <br />· (2) 6” Garmen-Rupp PA Series Pump (Model PA6c60-40450/51 or equivalent) <br />This equipment will most likely be provided by the operator. The loading, hauling, and grading <br />equipment can also be rented from Wagner Rents – Caterpillar Rental, 17800 E. 22nd Avenue, <br />Aurora, Colorado 80011. The drill and blasting equipment and services can be procured from <br />qualified contractors in the area. Costs for reclamation assumed loading, hauling, and grading <br />equipment rental, dewatering pump purchase, and procurement of a qualified drilling and blasting <br />contractor. <br />Item 2.1 Mined Area Earthwork: Drilling and Blasting <br />As described in Section 3.2, fill material will need to be generated on-site to provide material to <br />complete the Satellite South Pit backfill activities. This material will be generated in the South <br />Quarry, below the West Quarry, in the footprint approved under AM07 and is anticipated to be <br />completed concurrent with Satellite South Pit reclamation activities. Drilling and blasting will be <br />completed using drill and blast methods currently employed at the site (refer to AM05 for drill and <br />blasting methods). Based on current drilling and blasting methods, the material generated will be no <br />greater than 30 inches to support direct transport to the Satellite South Pit location for placement
The URL can be used to link to this page
Your browser does not support the video tag.