My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2024-02-01_REVISION - M1973021 (2)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1973021
>
2024-02-01_REVISION - M1973021 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/1/2024 12:43:10 PM
Creation date
2/1/2024 11:22:34 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1973021
IBM Index Class Name
Revision
Doc Date
2/1/2024
Doc Name Note
Adequacy Response 1
Doc Name
Adequacy Review Response
From
Holcim/HDR
To
DRMS
Type & Sequence
TR9
Archive
No
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1813
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Ninth Technical Revision (TR09) to Permit M-1973-021, Holcim- WCR, Inc. Morrison Quarry <br /> <br /> <br /> <br />January 2024 | 10 <br />3 Exhibit E – Reclamation Plan <br />3.1 Rationale for Technical Revision <br />Reclamation for the South Quarry and West Quarry above El. 6,600 remains unchanged from AM07. <br />This section focuses on reclamation of the Satellite South Pit introduced in Exhibit D – Mining Plan. <br />Holcim will be evaluating the possibility of leaving a portion of the pit areas currently slated for <br />backfilling available for water storage during mining operations, but the reclamation and backfill <br />called for herein and in AM07 will remain the reclamation plan unless modified and approved by <br />DRMS. <br />Exhibit F-1 shows reclamation within the South Quarry that is currently underway along the western <br />slope, referred to as the South Quarry West Wall above El. 7,000. <br />3.2 Satellite South Pit Reclamation Overview <br />Satellite South Pit reclamation will include backfilling the pit to El. 6,600 with materials generated on- <br />site. Based on an initial 40H:40V bench configuration, the volume of the pit requiring backfill is <br />approximately 2,648,832 yd3. With an assumed material swell factor of 70%, the volume of material <br />needed to backfill the Satellite South Pit is 1,85,182 loose cubic yards (LCY). <br />As was discussed in Exhibit D – Mining Plan, Section 2.3, mining will occur on two "fronts" <br />simultaneously: one continues South Quarry development, and one develops the West Quarry. In <br />early 2027, the timeframe when the Satellite South Pit is anticipated to reach its final base elevation <br />(estimated at El. 6480), the West Quarry mine plan will have advanced to the El. 6944 bench. The <br />current reserve analysis for the South Pit from El. 6944 to El. 6600, in the area below the West <br />Quarry, is 11 million tons of mineable gneiss (~8.1 million LCY) and 2.5 million tons (~1.8 million <br />LCY) of waste material. The remaining reserves in this area will provide adequate material for the <br />Satellite South Pit backfill. If additional mining is not anticipated or approved in a permit modification, <br />reclamation work will commence. Holcim intends to continue mining the South Quarry (below the <br />West Quarry El. 6944 bench) in accordance with the approved mining plan and use material from <br />this area to backfill the Satellite South Pit. As needed throughout backfill operations, stormwater will <br />be managed in accordance with the Storm Water Management Plan (Rev. 6, June 2021). <br /> <br />Once backfill has been completed to El. 6,600, final grading, restoration, and revegetation will be <br />completed in accordance with the AM07 reclamation plan with one exception. The final grading of <br />the South Quarry floor (El. 6,600) will be completed with a 3% slope (southwest or northeast) <br />conveying stormwater to Outfall 003 and the main quarry access road which will remain per AM07. <br />This final grading strategy combined with elevating the South Quarry floor to El. 6,600 removes the <br />horizontal drain requirement recommended in AM07. <br />Refer to Exhibit F for the reclamation map and three cross sections summarizing the key attributes <br />of the modified South Quarry reclamation plan.
The URL can be used to link to this page
Your browser does not support the video tag.