material forms a 2H:1 V slope that extends all the way to the top and sides of the exposed <br /> highwall. <br /> Stockpile areas will be marked in the field by the PROJECT MANAGER. Large fill material must <br /> be placed first followed by smaller fill material or as directed by the PROJECT MANAGER. Once <br /> backfilling is complete, all borrow areas must be graded to a slope of 2H:1V or less. <br /> Measurement and Payment <br /> There will be no measurement for payment for this task. Payment shall be for the lump sum bid <br /> price under Item 7.1 of the Bid Schedule. The lump sum bid shall include all costs for labor, <br /> equipment, materials, fuel and all others items necessary to backfill the highwall as described in <br /> Item 7.1. Payment will be made upon completion of this task and approval from the PROJECT <br /> MANAGER. <br /> Item 7.2: Surface Roughening and Revegetation <br /> All areas disturbed during reclamation work including access routes and any other areas <br /> specified in these Special Conditions or by the PROJECT MANAGER will be revegetated <br /> according to the Revegetation specification, SWS 20. Approximately one and one-half (1.5) <br /> acres will be revegetated. <br /> Prior to seeding, the compacted ground surface will be roughened to minimize erosion and to <br /> promote better vegetative development. Surface roughening will be accomplished in the <br /> following manner: <br /> Two (2) tons of certified weed-free straw mulch per acre will be evenly distributed over the <br /> ground surface. Once mulch has been applied over an area, an excavator bucket will be used <br /> to intensely roughen the surface by creating numerous gouges. Bucket size shall not exceed <br /> four feet (4') in width and the depth of the gouges shall be between twelve inches (12") and <br /> eighteen inches (18") deep. Gouges must not exceed eighteen inches (18") in depth. Gouges <br /> shall span the entire width of the disturbed area from edge to edge with the pattern alternating <br /> (off-set) between each row. Gouges must be placed close enough so that no more than eighteen <br /> inches (18") exist between any two gouges, in any direction, both vertical and horizontal. <br /> Commercial fertilizer, Triton 4-6-2 (N-P-K), or approved equivalent, is required for this project <br /> and must be provided by CONTRACTOR. The fertilizer will be distributed at a rate of six hundred <br /> (600) pounds per acre. CONTRACTOR will hand broadcast fertilizer over all disturbed areas <br /> following scarification. Liquid application is also acceptable. <br /> CONTRACTOR shall provide a total of nine hundred (900) pounds of fertilizer and three (3) tons <br /> of straw mulch to complete this task. Straw mulch must be certified as noxious weed-free by an <br /> authorized state or county officer. Documentation of certification must be provided to the <br /> PROJECT MANAGER prior to application of mulch. <br /> Seed will be supplied by OWNER. A region specific native seed mix — High Elevation Meadow, <br /> Coniferous Woodland/Forest and Aspen (Zone 5) —will be used on all areas. <br /> Rev. 07/07/2023 <br /> Page 18 of 20 <br />