My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2023-06-23_GENERAL DOCUMENTS - M2004045
DRMS
>
Day Forward
>
General Documents
>
Minerals
>
M2004045
>
2023-06-23_GENERAL DOCUMENTS - M2004045
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/3/2024 2:53:28 PM
Creation date
1/3/2024 2:14:18 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2004045
IBM Index Class Name
General Documents
Doc Date
6/23/2023
Doc Name Note
Hanna Bond Forefeiture Project
Doc Name
IMP Closeout Files
From
DRMS
To
DRMS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
44
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ITEM 7.0-ADDITIONAL EQUIPMENT TIME-DUMP TRUCK-Not Guaranteed <br /> Equipment rental. One hour (1 hr.) of a Peterbuilt 379 truck (or equivalent) with operator <br /> per Section 19.0 of the Colorado Inactive Mine Reclamation Program General Bid <br /> Specifications, 2009, if required <br /> MEASUREMENT AND PAYMENT <br /> Measurement for payment shall be made per hour, prorated to the nearest quarter hour <br /> for the actual unit quantities provided according to specification in Section 19.0 of the <br /> General Bid Specifications, 2009. Payment will be made at the unit price established in <br /> Item 7.0 of the Bid Schedule. Such payment shall include the cost of all materials, <br /> accessories, labor, maintenance, operating supplies, salaries of operators, and any other <br /> expenses incidental to the operation of the equipment in the performance of work in <br /> accordance with this specification and bid item(s). <br /> PROJECT OBSERVATION <br /> The PROJECT MANAGER will be at the project site periodically to monitor construction <br /> activities and ensure that each work item is completed and constructed to design <br /> specifications. The PROJECT MANAGER will be available during regular business hours <br /> (8:00 A.M. to 5:00 P.M.) on weekdays. Inspections will not be scheduled on weekend <br /> days or holidays without prior approval of the PROJECT MANAGER. It is the <br /> CONTRACTOR's responsibility to schedule inspections with the Project Manager so as <br /> not to delay the work. The following items must be observed and approved by the <br /> PROJECT MANAGER before proceeding with additional work: <br /> 1. Final grade of pit walls and floor prior to revegetation. <br /> The attached Bid Schedule form must be submitted. Award will be made to the apparent <br /> low bidder if the low quote is within the project budget estimate, and if the CONTRACTOR'S <br /> equipment and proposed schedule are deemed sufficient by the Division to accomplish the <br /> project within the specified time of completion. <br /> Page 11 of 11 <br />
The URL can be used to link to this page
Your browser does not support the video tag.