My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2014-10-07_GENERAL DOCUMENTS - M1981184
DRMS
>
Day Forward
>
General Documents
>
Minerals
>
M1981184
>
2014-10-07_GENERAL DOCUMENTS - M1981184
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/3/2024 2:52:18 PM
Creation date
1/3/2024 1:25:17 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1981184
IBM Index Class Name
General Documents
Doc Date
10/7/2014
Doc Name Note
Red Arrow Forfeiture Project
Doc Name
IMP Closeout Files
From
DRMS
To
DRMS
Media Type
D
Archive
No
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
274
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
a. Small petroleum product containers; <br /> b. Grizzly shaker located at the Gold Run Level; <br /> c. Explosives and detonator magazines; <br /> d. Various tools,personal property located on Gold Run and River Levels that are <br /> NOT within structures; <br /> e. Various debris located within permit boundary delineated by PROJECT <br /> MANAGER at the time of the project. <br /> All items will be delineated by the PROJECT MANAGER, who will keep a log of each <br /> item moved, the condition of the item prior to consolidation and who will take photos <br /> before and after movement to the consolidation pad. CONTRACTOR must use <br /> reasonable measures to prevent damage to all items delineated. <br /> Measure and Payment <br /> This task will be measured to the nearest 0.25 hour expended in the completion of Item <br /> 5.0. Payment shall be for the hourly cost of consolidation under Item 5.0 of the <br /> REVISED Bid Schedule and will be made at the completion of the task and upon <br /> approval by the PROJECT MANAGER. The price bid shall include all equipment, <br /> materials, labor, and all other items necessary and incidental to complete the tasks <br /> described in Item 5.0. <br /> 2. ITEM 6.0 All materials required for securing / repairing the River Level structure shall <br /> be provided by the CONTRACTOR. Such items include lumber, standard size industrial <br /> grade metal door, four inch (4") security hasp and all other necessary materials and <br /> equipment. Materials located on site ARE NOT permitted for use for the completion of <br /> this task. <br /> 3. ITEM 7.0 To prevent further erosion and down cutting, approximately four (4) Cross <br /> Vane structures will be constructed to the specifications included in the original bid <br /> document (Figure 4). Their locations in the stream section will be flagged by the <br /> PROJECT MANAGER at the time of construction. Construction may be done by hand if <br /> the CONTRACTOR chooses; no additional road bed or working area shall be constructed <br /> for installation of the structures. All vegetation in the channel and on the stream banks <br /> shall remain in place and intact. <br /> 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.