My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2014-10-07_GENERAL DOCUMENTS - M1981184
DRMS
>
Day Forward
>
General Documents
>
Minerals
>
M1981184
>
2014-10-07_GENERAL DOCUMENTS - M1981184
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/3/2024 2:52:18 PM
Creation date
1/3/2024 1:25:17 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1981184
IBM Index Class Name
General Documents
Doc Date
10/7/2014
Doc Name Note
Red Arrow Forfeiture Project
Doc Name
IMP Closeout Files
From
DRMS
To
DRMS
Media Type
D
Archive
No
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
274
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Trenches and other excavations more than three feet deep must be properly N/A <br /> shored or laid back to a 1:1 slope before personnel are allowed to enter. <br /> Procedures for night work shall be established and adequate illumination shall X <br /> be provided. <br /> During drilling and underground work, a recently calibrated multi gas tester with <br /> audible alarm (measuring 02 , CO, H2S) shall be used at all times. A record N/A <br /> shall be kept of tests. <br /> An MSHA 40 hour underground mine safety training certificate, or a current <br /> Underground Miner training certificate, is required for each employee working N/A <br /> underground. <br /> Self-rescuers must be worn during underground work. N/A <br /> Rubber boots or waders shall be provided for each employee working in wet N/A <br /> conditions. <br /> Temperature sensors shall be provided at work locations. N/A <br /> Other safety requirements <br /> F. ACCIDENT REPORTING <br /> All accidents and injuries must be immediately reported to the Colorado X <br /> Division of Reclamation, Mining and Safety project manager. <br /> The CONTRACTOR shall investigate all such occurrences and develop an X <br /> action plan to prevent their recurrence. <br /> All investigations shall be documented. X <br /> G. FIRST AID <br /> First aid kits meeting MSHA (CFR 75.1713-7 or 77.1707) requirements shall be X <br /> maintained in a sanitary condition and placed at all work sites. <br /> H. COMMUNICATIONS <br /> All work areas shall have a method to communicate with other personnel at all <br /> time. Personnel will never be allowed to work alone without a secure means of X <br /> communication and periodic checks by another party. <br /> All communications will be positive in nature. A response is required. X <br /> Provide an equipment spotter equipped with a radio. N/A <br /> I. EQUIPMENT OPERATION <br /> Seatbelts shall be used at all times. X <br /> Equipment always has the right-of-way. X <br /> Safe parking procedures (chock blocks, etc.) shall be used at all times. X <br /> All lights, horns, brakes, wipers, back-up alarms and other safety equipment X <br /> shall be fully operational at all times. <br /> Each piece of equipment shall have at least one portable fire X <br /> extinguisher. <br /> All mobile equipment, with the exception of pickup trucks with unrestricted rear X <br /> view, will be equipped with back-up alarms. <br />
The URL can be used to link to this page
Your browser does not support the video tag.