November 9, 2023 C-1981-019/Colowyo Coal Mine ZTT <br /> <br /> <br />Number of Partial Inspection this Fiscal Year: 3 <br />Number of Complete Inspections this Fiscal Year: 2 <br /> <br /> Page 4 of 9 <br /> <br />notably within Reach 1 in incremental lengths as well as along the inlets of the stock ponds, EP1 and EP2. The <br />entire ditch has been re-established and armored with rip rap as well. EP1 and EP2 have been repaired with <br />sediment removed and the trickle tube has been installed within EP2. EP3 has been constructed as well. EP3 is <br />located between the FEPD and the NTEPD just adjacent to EP1. EP3 is to act as additional storage from EP1 <br />which will ultimately direct surface flow into NTEPD. The Section 15 Ditch is currently being constructed and no <br />issues were observed. <br /> <br />Ponds associated with the East Pit are Streeter Pond, Prospect Pond, and the Section 15 Pond. The Streeter Pond <br />receives runoff associated with the Streeter Ditch. The pond held water but was not discharging at the time of the <br />inspection. The embankment was stable and well vegetated. The Prospect Pond receives runoff from the FEPD, <br />NTEPD and Prospect Ditches. The Prospect Pond held minimal water and was not discharging at the time of the <br />inspection. Both the Streeter and Prospect Ponds have been recently cleaned. Construction of the Section 15 Pond <br />was occurring during the inspection. The pond was nearing completion based on discussions with the Operator. <br />Gabion wire was observed to have been keyed in to where the inlet of the pond will be. Rip rap was actively being <br />staged for placement for the Section 15 Ditch near the pond at the time of the inspection. <br /> <br />EP2 maintenance. EP3 construction.