My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2023-10-31_REVISION - M1973021 (10)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1973021
>
2023-10-31_REVISION - M1973021 (10)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/1/2023 10:09:58 AM
Creation date
11/1/2023 8:07:39 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1973021
IBM Index Class Name
Revision
Doc Date
10/31/2023
Doc Name Note
Attachment B - Appendix C - CDPHE Permit and Stormwater Management Plan
Doc Name
Request for Technical Revision
From
Holcim - WCR, Inc.
To
DRMS
Type & Sequence
TR9
Media Type
D
Archive
No
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
251
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
STORMWATER MANAGEMENT PLAN MORRISON QUARRY <br /> REVISION NO.8 1 August 2022 CERTIFICATION NO.COG500320 <br /> • The average of quarterly sampling exceeds applicable benchmark. <br /> Corrective action reports shall be submitted with the annual report and a copy shall be retained <br /> in the facility's Stormwater Binder in Appendix H. Corrective action reports shall be documented <br /> within the following time frame following facility management becoming aware of any of the <br /> above conditions. <br /> 24 hour documentation requirement: <br /> • Identification of the condition triggering the need for corrective action review; <br /> • Description of the problem identified; and <br /> • Date the problem was identified. <br /> Five day documentation requirement: <br /> • Summary of corrective action taken or to be taken, or a summary that determines corrective <br /> actions are not required for conditions that only require review and modification (not <br /> conditions that need to be eliminated); <br /> • Notice of whether modifications to this SWMP are required as a result of this discovery or <br /> corrective action; <br /> • Date corrective action initiated; and <br /> • Date corrective action was completed or is expected to be completed. <br /> 8. RECORDKEEPING AND REPORTING <br /> SWMP documentation must be maintained in order to comply with the permit. ALL DOCUMENTS <br /> SHALL BE KEPT FOR A PERIOD OF THREE YEARS FROM THE DATE THAT COVERAGE UNDER THIS <br /> PERMIT EXPIRES OR IS TERMINATED. This section defines those requirements. <br /> 8.1 RECORDKEEPING <br /> The following documents are required to be kept with this SWMP. Appendices have been <br /> included in the Stormwater Binder for organization of the required documents. <br /> Required documentation and the associated appendix are as follows: <br /> • Appendix A- Permit Information <br /> • Appendix B - Correspondence and Agency Notifications <br /> 27 <br />
The URL can be used to link to this page
Your browser does not support the video tag.