My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2023-10-31_REVISION - M1973021 (10)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1973021
>
2023-10-31_REVISION - M1973021 (10)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/1/2023 10:09:58 AM
Creation date
11/1/2023 8:07:39 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1973021
IBM Index Class Name
Revision
Doc Date
10/31/2023
Doc Name Note
Attachment B - Appendix C - CDPHE Permit and Stormwater Management Plan
Doc Name
Request for Technical Revision
From
Holcim - WCR, Inc.
To
DRMS
Type & Sequence
TR9
Media Type
D
Archive
No
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
251
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
STORMWATER MANAGEMENT PLAN MORRISON QUARRY <br /> REVISION NO.8 1 August 2022 CERTIFICATION NO.COG500320 <br /> shall be collected, analyzed, and reported on the DMR. In addition, corrective action <br /> shall be taken immediately to mitigate the discharge of oil. <br /> 3: Total Phosphorus - Analysis for Total Phosphorus, as P, will be included in the permit <br /> certification for all discharges to waters with a control regulation for P. <br /> 6.4 BENCHMARK MONITORING <br /> Benchmark monitoring is not required at this facility. <br /> 6.5 WATER QUALITY STANDARDS MONITORING <br /> Water quality standards monitoring is not required under this permit. <br /> 7. CORRECTIVE ACTION DOCUMENTATION <br /> All corrective action reports shall be kept in the facility's Stormwater Binder in Appendix H. Blank <br /> forms are provided in Appendix C. A corrective action report shall be prepared if any of the <br /> following conditions occur at the facility (as identified by the facility, WQCD, or an EPA official, <br /> or local or State entity). In addition to the corrective report, the facility must review the selection, <br /> design, installation, and implementation of a facility control measures to eliminate conditions <br /> that must be eliminated and determine the appropriate modifications necessary for conditions <br /> that require review. <br /> Conditions that must be eliminated: <br /> • A spill, leak, or discharge of non-stormwater that are not authorized in Section 1 .4 of this <br /> SWMP; <br /> • A discharge violates a numeric effluent limit; <br /> • Facility control measures that are not stringent enough from the discharge to meet <br /> applicable water quality standards; <br /> • Modifications to the facility control measures which are necessary to meet the practice- <br /> based effluent limits in this permit; or <br /> • The facility finds in an inspection that control measures are not properly selected, designed, <br /> installed, operated or maintained. <br /> Conditions that require review and modification: <br /> • Construction or change in design, operation, or maintenance at the facility that significantly <br /> changes the nature of pollutants discharge in stormwater from the facility, or significantly <br /> increase the quantity of pollutants discharges; or <br /> 26 <br />
The URL can be used to link to this page
Your browser does not support the video tag.