My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2023-10-31_REVISION - M1973021 (10)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1973021
>
2023-10-31_REVISION - M1973021 (10)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/1/2023 10:09:58 AM
Creation date
11/1/2023 8:07:39 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1973021
IBM Index Class Name
Revision
Doc Date
10/31/2023
Doc Name Note
Attachment B - Appendix C - CDPHE Permit and Stormwater Management Plan
Doc Name
Request for Technical Revision
From
Holcim - WCR, Inc.
To
DRMS
Type & Sequence
TR9
Media Type
D
Archive
No
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
251
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
STORMWATER MANAGEMENT PLAN MORRISON QUARRY <br /> REVISION NO.8 1 August 2022 CERTIFICATION NO.COG500320 <br /> This SWMP will be promptly revised if the inspection reveals evidence of new pollutant <br /> sources or the need for new pollution prevention measures. Revisions will be made within <br /> two weeks of the inspection and will be documented in the amendment schedule at the <br /> beginning of this document. They will also be included in the annual report. <br /> 6. MONITORING <br /> CDPHE WQCD defines monitoring requirements for each facility in the Certification to Discharge. <br /> The required monitoring for this facility includes Quarterly Visual Monitoring and Process Water <br /> Discharge Monitoring. Laboratory samples are required for process water monitoring as defined <br /> in the Certification to Discharge. Quarterly visual monitoring forms are included in Appendix C. <br /> Completed forms shall be kept with the stormwater records in the facility's STORMWATER BINDER <br /> IN APPENDIX F. If a visual assessment indicates that control measures for the facility are <br /> inadequate or not being properly operated and maintained, the facility must conduct <br /> corrective actions as described in Section 7 of this SWMP. <br /> Quarterly, during a discharge event a perimeter walk must be performed. In the event of an <br /> offsite discharge is observed during the following visual monitoring shall be performed. IF NO <br /> DISCHARGE IS OBSERVED, THAT WILL BE NOTED ON THE QUARTERLY VISUAL INSPECTION FORM <br /> AND KEPT IN THE FACILITY'S STORMWATER BINDER IN APPENDIX F. <br /> 6.1 DISCHARGE EVENTS <br /> Visual monitoring is not required to be conducted during a measurable storm event for <br /> any stormwater outfalls due to the exception allowed in Part I.H.7 of the permit. <br /> Additionally, stormwater at this facility is only discharged through permitted process <br /> water outfalls and applicable effluent limitations apply. <br /> A measurable storm event is defined as follows: <br /> • Rain Event - An event that results in actual discharge at the facility and follows the <br /> preceding storm event by at least 72 hours (three days); or <br /> • Snow Event-A snowmelt event where measurable discharge occurs from the facility. <br /> Visual monitoring must be collected within the first 30 minutes of a measurable storm <br /> event. If it is not possible to collect the sample within the first 30 minutes of a measurable <br /> storm event, the sample must be collected as soon as practicable after the first 30 <br /> minutes. In the case of a snowmelt, sample must only be taken during a period with <br /> measurable discharge. <br /> 23 <br />
The URL can be used to link to this page
Your browser does not support the video tag.