My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2023-10-31_REVISION - M1973021 (10)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1973021
>
2023-10-31_REVISION - M1973021 (10)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/1/2023 10:09:58 AM
Creation date
11/1/2023 8:07:39 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1973021
IBM Index Class Name
Revision
Doc Date
10/31/2023
Doc Name Note
Attachment B - Appendix C - CDPHE Permit and Stormwater Management Plan
Doc Name
Request for Technical Revision
From
Holcim - WCR, Inc.
To
DRMS
Type & Sequence
TR9
Media Type
D
Archive
No
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
251
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
STORMWATER MANAGEMENT PLAN MORRISON QUARRY <br /> REVISION NO.8 1 August 2022 CERTIFICATION NO.COG500320 <br /> • Presence of floating materials, visible oil sheen, discoloration, turbidity, odor, etc. in <br /> the stormwater discharges, if applicable <br /> • Condition of outfalls, if applicable <br /> • Presence of any non-stormwater discharges not included in Section 1.4 <br /> VERIFICATION <br /> • Verification that tables reflect current conditions <br /> • Verification that the figures reflect current conditions <br /> ASSESSMENT <br /> • Effectiveness of the existing control measures <br /> • Locations of control measures that need maintenance or repair <br /> o Reason and schedule for maintenance or repair <br /> • Locations and rational for where additional control measures are needed <br /> 5.2 INSPECTION FREQUENCY <br /> Visual inspections of the facility shall be conducted and documented at least quarterly <br /> (i.e. once each calendar quarter). At least one inspection in the calendar year shall be <br /> conducted during a runoff event. Inspections will be conducted at least 20 days apart <br /> by a member of the Environmental team, plant manager/supervisor, or designee <br /> 5.3 INSPECTION DOCUMENTATION <br /> INSPECTION DOCUMENTATION SHALL BE MAINTAINED IN THE FACILITY'S STORMWATER <br /> BINDER IN APPENDIX E. Appendix C also includes the inspection certification and <br /> documentation form. Inspection documentation will be available for review by the <br /> CDPHE WQCD upon request. The documentation will describe the inspection date and <br /> time, locations inspected, weather information, a summary report and schedule of <br /> implementation of corrective actions. In addition, the inspections will be summarized in <br /> the annual report. <br /> The inspection documentation will include the name, title and signature of the person <br /> conducting the site inspection. The inspection will be signed and certified by the SWMP <br /> administrator or duly authorized representative. The certification will contain the <br /> language as depicted in Part I.F.4 of the permit. <br /> 22 <br />
The URL can be used to link to this page
Your browser does not support the video tag.