Laserfiche WebLink
STORMWATER MANAGEMENT PLAN MORRISON QUARRY <br /> REVISION NO.8 1 August 2022 CERTIFICATION NO.COG500320 <br /> o Background information <br /> o Status of permit <br /> • Pertinent components of the permit <br /> o SWMP <br /> ■ Spill response and cleanup procedures <br /> ■ Good housekeeping procedures <br /> ■ BMPs <br /> • What they are and where they apply <br /> • Implementation <br /> • Maintenance <br /> • Reporting and recordkeeping <br /> • Enforcement <br /> Sector-specific requirements include training on the following items: <br /> • Used oil and spent solvent management; <br /> • Fueling procedures; <br /> • General good housekeeping practices; <br /> • Proper painting procedures; and <br /> • Used battery management. <br /> 4.10 NON-STORMWATER DISCHARGES <br /> The facility does not have non-stormwater discharges except defined in Section 1.4 and <br /> permitted by the permit certification. <br /> 4.11 WASTE, GARBAGE AND FLOATABLE DEBRIS <br /> Discharge of waste, garbage and floatable debris from the site is maintained by periodic <br /> inspections and by keeping exposed areas free of such materials or by intercepting them <br /> before they are discharged. <br /> 20 <br />