My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2023-09-20_INSPECTION - C1981019
DRMS
>
Day Forward
>
Inspection
>
Coal
>
C1981019
>
2023-09-20_INSPECTION - C1981019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/12/2023 9:02:54 AM
Creation date
9/20/2023 10:43:10 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981019
IBM Index Class Name
Inspection
Doc Date
9/20/2023
Doc Name
Inspection Report
From
Division
To
Colowyo
Inspection Date
9/11/2023
Email Name
ZTT
AME
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
September 11, 2023 C-1981-019/Colowyo Coal Mine ZTT <br /> <br /> <br />Number of Partial Inspection this Fiscal Year: 3 <br />Number of Complete Inspections this Fiscal Year: 1 <br /> <br /> Page 6 of 10 <br /> <br />D3 are all armored with rip rap while D6 is approved as a bare channel. No erosion or issues were observed. <br /> <br />Ponds Section 25, Section 26, Section 36, Middle and Sidehill were inspected. Section 36, Section 25 and Middle <br />Pond run in serious with each other and collect runoff from the eastern portion of disturbance from the Collom Pit. <br />Each of these ponds held water with only Section 25 observed as discharging. The Sidehill and Section 26 ponds <br />run in series with each other as well and receive runoff from the western portion of the Collom Pit. Both ponds <br />held water but the Sidehill was minimal. The slumping above Section 26 pond continues to show no signs of <br />additional movement. Discussions with the mine representative stated Section 26 Pond is scheduled for cleaning <br />maintenance which includes mitigation of the slump. All Collom Ponds were stable and no issues were observed. <br /> <br />Section 26 Pond. <br />RECLAMATION SUCCESS - Rule 4.15, Rule 3: <br />Reclamation parcels EP061, WP026, WP027, WP028, WP029 and WP032 were inspected for reclamation <br />success. These parcels are associated with requested SL-22 Phase II bond release application. Each parcel was <br />well vegetated with no observed erosion. For more information regarding the SL-22 bond release inspection, <br />please refer to the Division’s inspection report dated 9/15/23. <br /> <br />Reclamation parcel ST001 was inspected. ST001 is located just east of the South Taylor Pit and was reclaimed in <br />2011. The parcel has received rill and gully maintenance in 2022. The maintenance areas showed limited <br />vegetation growth however remains stable with no major signs of erosion was observed. <br /> <br />Results from previous weed spraying operations were observed throughout the site most notably along areas with <br />thistle. Discussions about observed cheatgrass mitigation was discussed in regards to areas showing success. <br />Colowyo has implemented different spraying applications which has produced noticeable results in older <br />reclamation parcels that have been previously documented with cheatgrass infestations. While cheatgrass was <br />observed during the inspection, Colowyo has stated they will continue with the current successful mitigation <br />measures to manage its presence.
The URL can be used to link to this page
Your browser does not support the video tag.