My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2023-09-20_INSPECTION - C1981019
DRMS
>
Day Forward
>
Inspection
>
Coal
>
C1981019
>
2023-09-20_INSPECTION - C1981019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/12/2023 9:02:54 AM
Creation date
9/20/2023 10:43:10 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981019
IBM Index Class Name
Inspection
Doc Date
9/20/2023
Doc Name
Inspection Report
From
Division
To
Colowyo
Inspection Date
9/11/2023
Email Name
ZTT
AME
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
September 11, 2023 C-1981-019/Colowyo Coal Mine ZTT <br /> <br /> <br />Number of Partial Inspection this Fiscal Year: 3 <br />Number of Complete Inspections this Fiscal Year: 1 <br /> <br /> Page 7 of 10 <br /> <br /> <br />Reclamation parcel EP061. Reclamation parcel WP029. <br /> <br />SIGNS AND MARKERS – Rule 4.02: <br />Mine identification sign is located at the security building located at the mine entrance. Additional signs were <br />observed along the permit boundary and Highway 13 corridor. <br /> <br />TOPSOIL – Rule 4.06 <br />Removal 4.06.2; Substitute Materials 4.06.4(4); Storage and Protection 4.06.3; Redistribution 4.06.4: <br />Topsoil stripping activities and associated approved disturbance boundaries were inspected along the Collom Pit. <br />Stripping activities were occurring and have previously occurred along the western slope of the Little Collom <br />Gulch as well as directly south of the Collom Pit. All stripping occurred is for the advancement of highwall mining <br />activity as well as future dragline operations as mining within the Collom Pit advances to the south. Topsoil Pile <br />2A was being constructed at the time of the inspection. Topsoil was being transported by trucks and being end <br />dumped along the southern end of the topsoil pile footprint. The disturbance boundary was tracked by GPS and <br />compared to the most recently approved Map 13C-1 Sheet 1 - Cumulative Bond Areas. All associated disturbance <br />to stripping operations at the Collom Pit were within the approved boundary. Additional topsoil placement was <br />also observed at the Collom topsoil pile 26A as well.
The URL can be used to link to this page
Your browser does not support the video tag.