Laserfiche WebLink
Cost Summary Worksheet Cont’d Task # 000 Page 5 of 6 <br /> <br />CIRCES Cost Estimating Software <br />407 Haul/Regrade Topsoil to Collom Haul Road: <br />112+26 - 149+00 <br />TRUCK1 1 13.83 $53,684 <br />408 Haul/Regrade Topsoil to Collom Haul Road: <br />149+00 - 222+20 <br />TRUCK1 1 27.15 $117,933 <br />409 Haul/Regrade Topsoil to Collom Haul Road: <br />222+20 - 242+00 <br />TRUCK1 1 3.60 $15,631 <br />410 Haul/Regrade Topsoil to Collom Haul Road: <br />242+00 - 275+20 <br />TRUCK1 1 8.51 $33,036 <br />411 Haul/Regrade Topsoil to Collom Haul Road: <br />275+20 - 298+10 <br />TRUCK1 1 12.35 $47,956 <br />412 Haul/Regrade Topsoil to Collom Haul Road: <br />298+10 - 336+00 <br />TRUCK1 1 13.11 $50,883 <br />413 Haul/Regrade Topsoil to Collom Haul Road: <br />336+00 - 396+89 <br />TRUCK1 1 26.39 $114,595 <br />415 Regrade Collom Facility Area DOZER 4 523.23 $1,268,120 <br />416 Load/Haul/Regrade Topsoil to Collom Facility <br />from TS 25A <br />TRUCK1 1 96.36 $568,855 <br />417 Section 25 Pond Removal DOZER 1 13.49 $7,710 <br />418 Middle Pond Removal DOZER 1 4.95 $2,832 <br />419 Section 36 Pond Removal DOZER 1 8.09 $4,626 <br />420 Section 26 Pond Removal DOZER 1 12.19 $6,968 <br />421 Sidehill Pond Removal DOZER 1 23.21 $13,265 <br />422 Coal Stockpile Pond Removal DOZER 1 63.87 $36,507 <br />423 Temporary Facilities Pond Removal DOZER 1 4.73 $2,703 <br />424 Wilson Storage Pond Removal DOZER 1 15.80 $9,033 <br />425 Regrade Ditch D1 DOZER 1 1.72 $985 <br />426 Regrade Ditch D2 DOZER 1 3.13 $1,787 <br />427 Regrade Ditch D3 DOZER 1 1.78 $1,018 <br />428 Regrade Ditch D4 DOZER 1 1.27 $727 <br />429 Regrade Ditch D5 DOZER 1 3.14 $1,792 <br />430 Regrade Ditch D6 DOZER 1 3.08 $1,763 <br />431 Regrade Topsoil for Ditch D1 DOZER 1 0.30 $174 <br />432 Regrade Topsoil for Ditch D2 DOZER 1 1.40 $801 <br />433 Regrade Topsoil for Ditch D3 DOZER 1 0.22 $125 <br />434 Regrade Topsoil for Ditch D4 DOZER 1 0.16 $90 <br />435 Regrade Topsoil for Ditch D5 DOZER 1 0.87 $499 <br />436 Regrade Topsoil for Ditch D6 DOZER 1 1.37 $785 <br />437 Regrade Topsoil for West Side Pond Access Road DOZER 1 4.42 $2,529 <br />438 Regrade Topsoil for East Side Pond Access Road DOZER 1 4.42 $2,529 <br />439 Regrade Topsoil for Topsoil Access Road DOZER 1 29.81 $17,042 <br />440 Regrade Topsoil for Temporary North Access <br />Road <br />DOZER 1 10.00 $5,715 <br />441 Regrade Topsoil for Temporary South Access <br />Road <br />DOZER 1 10.00 $5,715 <br />442 Regrade Topsoil for Tie-In Road Access Road DOZER 1 1.43 $816 <br />443 Reseed Collom Access Roads (Exh. 13C Table <br />13C-17) <br />REVEGE 1 16.00 $18,946 <br />444 Regrade Topsoil for Raw Water Line DOZER 1 16.54 $10,023 <br />445 Reseed Collom Raw Water Line REVEGE 1 18.00 $21,073 <br />446 Load, Haul and Regrade Collom Pit Topsoil–RN- <br />08 Permit Term <br />TRUCK1 1 462.40 $2,516,341 <br />447 Load, Haul and Regrade Collom Pit TRUCK1 1 7,883.03 $42,898,608 <br />448 Reseed Collom Pit and Temporary Spoil Pile REVEGE 1 429.00 $497,064 <br />450 Reseed Collom TS Pile Footprints 25B, 26A, 26B, <br />36A <br />REVEGE 1 40.50 $47,163