Laserfiche WebLink
Cost Summary Worksheet Cont’d Task # 000 Page 4 of 6 <br /> <br />CIRCES Cost Estimating Software <br />121 Reseed Section 28 Pond with Grazing Land Seed <br />Mix <br />REVEGE 1 5.00 $1,448 <br />122 Reseed West Taylor Pond with Grazing Land Seed <br />Mix <br />REVEGE 1 5.00 $1,448 <br />123 Reseed Perimeter Ditches with Grazing Land Seed <br />Mix <br />REVEGE 1 15.00 $17,150 <br />124 Reseed Aspen Reestablishment Area REVEGE 1 24.00 $270,661 <br />125 Plant Tall Shrub Reestablishment Areas REVEGE 1 36.00 $401,403 <br />126 Weed Control - 10% of Reseeded Areas Four <br />Times <br />REVEGE 1 1,280.00 $254,029 <br />127 Demolish and Remove all Facilities DEMOLISH 1 600.00 $2,399,434 <br />128 Mobilize/Demobilize Equipment for Initial <br />Reclamation <br />MOBILIZE 1 107.55 $1,336,676 <br />129 Mobilize/Demobilize Equipment for Pond and <br />Ditch Removal <br />MOBILIZE 1 5.55 $10,106 <br />130 Mobilize/Demobilize Equipment for Yearly Site <br />Maintenance <br />MOBILIZE 1 12.22 $80,119 <br />131 Mobilize/Demobilize Equipment for Two Pond <br />Cleanings <br />MOBILIZE 1 8.44 $6,595 <br />132 Site Maintenance During Ten Year Liability Period SITEMAINT <br />ENANCE <br />1 800.00 $706,284 <br />133 Pump 11 Sediment Ponds Prior to Two Cleanings PUMPING 1 173.10 $26,197 <br />134 Clean 11 Sediment Ponds Two Times (SL16) TRUCK1 1 537.30 $220,701 <br />135 Reseed Emergency Road to Power Pole with <br />GLMix <br />REVEGE 1 0.80 $232 <br />136 Reseed Geotechnical Hole Access Corridors REVEGE 1 2.00 $1,221 <br />137 PM Drainage E., W., and ST Pits NA 1 6,620.18 $1,263,130 <br />138 Rip Cut Line from Brush Fire (South Taylor) RIPPER 1 1.51 $937 <br />139 Reseed Cut Line from Brush Fire (South Taylor) REVEGE 1 2.00 $1,709 <br />140 Reseed Admin Building REVEGE 1 0.80 $2,549 <br />141 Remove and Regrade Stock Pond PD1 EXCAVATE 1 4.18 $776 <br />142 Remove and Regrade Stock Pond PD2 EXCAVATE 1 5.77 $1,070 <br />143 Remove and Regrade Stock Pond EP1 EXCAVATE 1 4.83 $896 <br />144 Remove and Regrade Stock Pond EP2 EXCAVATE 1 9.16 $1,699 <br />145 Remove and Regrade Stock Pond NTEP1 EXCAVATE 1 7.79 $1,445 <br />146 Remove and Regrade Stock Pond ET1 EXCAVATE 1 2.66 $495 <br />147 Remove and Regrade Stock Pond ET2 EXCAVATE 1 8.87 $1,645 <br />148 Remove and Regrade Stock Pond ETD1 EXCAVATE 1 3.60 $669 <br />149 Remove and Regrade Stock Pond ETD2 EXCAVATE 1 3.60 $669 <br />150 Remove and Regrade Stock Pond WTD1 EXCAVATE 1 3.60 $669 <br />151 Regrade Haul Road A Widening DOZER 1 440.36 $273,903 <br />152 Regrade Topsoil for Raw Water Line Expansion DOZER 1 0.08 $50 <br />153 Reseed Raw Water Line Expansion REVEGE 1 0.50 $1,221 <br />401 Remove Collom Haul Road and Facility Culverts <br />(MR203) <br />DEMOLISH 1 24.00 $100,113 <br />402 Demo Collom Facilities and Haul Road Crossing <br />(MR223, MR225) <br />DEMOLISH 1 60.00 $295,473 <br />403 Rip 29,458' of Collom Haul Road RIPPER 2 12.69 $2,836 <br />404 Haul/Regrade Spoil to Collom Haul Road: 00+00 - <br />208+00 <br />TRUCK1 1 138.53 $537,723 <br />405 Haul/Regrade Spoil to Collom Haul Road: 208+00 <br />- 282+00 <br />TRUCK1 1 138.01 $599,403 <br />406 Haul/Regrade Spoil to Collom Haul Road: 282+00 <br />- 395+00 <br />TRUCK1 1 89.87 $431,764