My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2023-02-21_PERMIT FILE - C1981019A (4)
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C1981019
>
2023-02-21_PERMIT FILE - C1981019A (4)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/7/2024 9:01:45 AM
Creation date
9/12/2023 3:02:12 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981019A
IBM Index Class Name
Permit File
Doc Date
2/21/2023
Section_Exhibit Name
Exhibit 13A Reclamation Cost Estimate
Media Type
D
Archive
Yes
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
496
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Cost Summary Worksheet Cont’d Task # 000 Page 3 of 6 <br /> <br />CIRCES Cost Estimating Software <br />086 Replace Topsoil from Stockpile to Stoker Siding <br />Pond <br />DOZER 1 2.65 $948 <br />087 Replace Topsoil from Stockpile to Wash Bay Pond DOZER 1 12.72 $4,551 <br />088 Replace Topsoil from Stockpile to Wash Bay <br />Sediment Sump <br />DOZER 1 2.47 $885 <br />089 Replace Topsoil from Stockpile to Work Area <br />Pond <br />DOZER 1 13.43 $4,804 <br />090 Replace Topsoil from Stockpile to Section 16 Pond DOZER 1 16.25 $5,814 <br />091 Replace Topsoil from Stockpile to East Taylor <br />Pond <br />DOZER 1 6.01 $2,149 <br />092 Replace Topsoil from Stockpile to Taylor Pump <br />Holding Pond <br />DOZER 1 1.77 $632 <br />093 Replace Topsoil from Stockpile to West Pit Pond DOZER 1 10.95 $3,918 <br />094 Replace Topsoil from Stockpile to Section 28 Pond DOZER 1 8.83 $3,160 <br />095 Replace Topsoil from Topsoil Pile 17F to West <br />Taylor Pond <br />DOZER 1 8.83 $3,160 <br />096 Replace Topsoil from Stockpile to Collection <br />Ditches <br />EXCAVATE 1 79.52 $14,744 <br />097 Plug and Seal All Wells and Piezometers for EP, <br />WP and STP <br />BOREHOLE 1 28.00 $14,595 <br />098 Seal South Taylor In-Pit Exploration Holes <br />(MR153+MR158) <br />BOREHOLE 1 164.00 $90,374 <br />099 Reseed East Pit with Grazing Land Seed Mix REVEGE 1 105.00 $121,383 <br />100 Reseed East Pit with Sagebrush Steppe Seed Mix REVEGE 1 27.00 $41,908 <br />101 Reseed West Pit and Facility Area with Grazing <br />Land Seed Mix <br />REVEGE 1 498.00 $576,963 <br />102 Reseed West Pit with Sagebrush Steppe Seed Mix REVEGE 1 249.00 $388,331 <br />103 Reseed South Taylor Pit with Grazing Land Seed <br />Mix <br />REVEGE 1 249.00 $288,481 <br />104 Reseed Gossard Loadout with Grazing Land Seed <br />Mix <br />REVEGE 1 30.00 $8,691 <br />105 Reseed Haul Road A with Grazing Land Seed Mix REVEGE 1 18.00 $21,206 <br />106 Reseed Haul Road B with Grazing Land Seed Mix REVEGE 1 21.20 $6,142 <br />107 Reseed Prospect Pond with Grazing Land Seed <br />Mix <br />REVEGE 1 5.20 $1,506 <br />108 Reseed Streeter Pond with Grazing Land Seed Mix REVEGE 1 8.40 $2,433 <br />109 Reseed Rail Loop Pond with Grazing Land Seed <br />Mix <br />REVEGE 1 1.00 $290 <br />110 Reseed Gossard Pond with Grazing Land Seed Mix REVEGE 1 3.00 $869 <br />111 Reseed Sewage and Aeration Pond with Grazing <br />Land Seed Mix <br />REVEGE 1 5.80 $1,680 <br />112 Reseed Stoker Siding Pond with Grazing Land <br />Seed Mix (MR208) <br />REVEGE 1 0.40 $464 <br />113 Reseed Wash Bay Pond with Grazing Land Seed <br />Mix <br />REVEGE 1 7.20 $2,086 <br />114 Reseed Wash Bay Sediment Sump with Grazing <br />Land Seed Mix <br />REVEGE 1 1.40 $406 <br />115 Reseed Work Area Pond with Grazing Land Seed <br />Mix <br />REVEGE 1 7.60 $2,202 <br />116 Reseed Section 16 Pond with Grazing Land Seed <br />Mix <br />REVEGE 1 9.20 $2,665 <br />117 Reseed East Taylor Pond with Grazing Land Seed <br />Mix <br />REVEGE 1 3.40 $985 <br />119 Reseed Taylor Pond with Grazing Land Seed Mix REVEGE 1 1.00 $290 <br />120 Reseed West Pit Pond with Grazing Land Seed <br />Mix <br />REVEGE 1 6.20 $1,796
The URL can be used to link to this page
Your browser does not support the video tag.