My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2023-02-21_PERMIT FILE - C1981019A (4)
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C1981019
>
2023-02-21_PERMIT FILE - C1981019A (4)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/7/2024 9:01:45 AM
Creation date
9/12/2023 3:02:12 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981019A
IBM Index Class Name
Permit File
Doc Date
2/21/2023
Section_Exhibit Name
Exhibit 13A Reclamation Cost Estimate
Media Type
D
Archive
Yes
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
496
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Cost Summary Worksheet Cont’d Task # 000 Page 2 of 6 <br /> <br />CIRCES Cost Estimating Software <br />039 Regrade Sewage and Aeration Pond DOZER 1 12.87 $4,481 <br />040 Regrade Stoker Siding Pond DOZER 1 7.52 $2,620 <br />041 Regrade Wash Bay Pond DOZER 1 38.23 $13,312 <br />042 Regrade Wash Bay Sediment Sump DOZER 1 1.78 $620 <br />043 Regrade Work Area Pond DOZER 1 134.18 $46,727 <br />044 Regrade Section 16 Pond DOZER 1 43.08 $15,003 <br />045 Regrade East Taylor Pond DOZER 1 19.87 $6,919 <br />046 Regrade Taylor Pond DOZER 1 7.77 $2,707 <br />047 Regrade Taylor Pump Holding Pond DOZER 1 55.40 $19,291 <br />048 Regrade Section 28 Pond DOZER 1 64.92 $22,606 <br />049 Regrade West Taylor Pond DOZER 1 21.38 $7,446 <br />050 Remove and Regrade South Collection Ditch EXCAVATE 1 62.58 $11,603 <br />051 Remove and Regrade Prospect Collection Ditch EXCAVATE 1 11.52 $2,137 <br />052 Remove and Regrade North Side Facilities Ditch EXCAVATE 1 6.10 $1,132 <br />053 Remove and Regrade Stoker Ditch EXCAVATE 1 5.85 $1,085 <br />054 Remove and Regrade West Side Facilities Ditch EXCAVATE 1 24.42 $4,528 <br />055 Remove and Regrade West Pit Coal Road Ditch EXCAVATE 1 14.24 $2,642 <br />056 Remove and Regrade Section 16 Pond Ditch EXCAVATE 1 27.13 $5,032 <br />057 Remove and Regrade Section 16 Perimeter Ditch EXCAVATE 1 14.92 $2,767 <br />058 Remove and Regrade Section 28 Collector Ditch EXCAVATE 1 15.87 $2,943 <br />059 Remove and Regrade Section 29 Collector Ditch EXCAVATE 1 22.36 $4,146 <br />060 Remove and Regrade 4 Haul Road A Sediment <br />Traps <br />EXCAVATE 1 4.32 $803 <br />061 Remove and Regrade Six Post-Mining Stock <br />Ponds <br />EXCAVATE 1 52.66 $9,764 <br />062 Doze Topsoil Pile 9A in West Pit DOZER 1 0.70 $250 <br />063 Haul Topsoil from Stockpile 15A to Facilities Area TRUCK1 2 161.98 $1,540,477 <br />064 Haul Topsoil from Pile 15B to West Pit TRUCK1 2 31.21 $296,773 <br />065 Haul Topsoil from Stockpile 15E to Facilities Area TRUCK1 2 0.46 $3,938 <br />066 Haul Topsoil from Stockpile 15F to Facilities Area TRUCK1 2 1.16 $9,988 <br />067 Haul Topsoil from Stockpile 15G to Facilities Area TRUCK1 2 3.56 $33,897 <br />068 Haul Topsoil from Stockpile 15H to Facilities Area TRUCK1 2 8.39 $72,044 <br />069 Haul Topsoil from Stockpile 15I to Haul Road A TRUCK1 2 5.71 $49,029 <br />070 Haul Topsoil from Pile 16C to South Taylor Pit TRUCK1 2 20.24 $192,503 <br />071 Haul Topsoil from Pile 16D to South Taylor Pit TRUCK1 2 135.49 $1,288,494 <br />072 Haul Topsoil from Pile 16E to South Taylor Pit TRUCK1 2 129.16 $1,228,280 <br />073 Haul Topsoil from Pile 17A to Haul Road A <br />(TR119) <br />TRUCK1 2 2.08 $19,783 <br />074 Haul Topsoil from Stockpile 17A - 17E to Gossard <br />Loadout <br />TRUCK1 2 1.49 $12,754 <br />075 Haul Topsoil from Stockpile 18 to South Taylor Pit TRUCK1 2 70.45 $734,951 <br />076 Haul Topsoil from Stockpile 27A to Haul Road A TRUCK1 2 2.08 $21,702 <br />077 Doze Topsoil from Windrow 1 - Windrow 5 in <br />West Pit <br />DOZER 1 37.70 $23,447 <br />078 Replace 48" of Topsoil on Aspen Study Area TRUCK1 2 11.09 $105,508 <br />079 Replace 48" of Topsoil on Tall Mountain Shrub <br />Study Area <br />TRUCK1 2 8.32 $79,127 <br />080 Replace 4" of Topsoil on Tall Mountain Shrub <br />Study Area <br />TRUCK1 2 0.69 $5,472 <br />081 Replace Topsoil from Stockpile to Prospect Pond DOZER 1 9.19 $3,287 <br />082 Replace Topsoil from Stockpile to Streeter Pond DOZER 1 14.84 $5,309 <br />083 Replace Topsoil from Stockpile to Rail Loop Pond DOZER 1 1.77 $632 <br />084 Replace Topsoil from Stockpile to Gossard Pond DOZER 1 5.30 $1,896 <br />085 Replace Topsoil from Stockpile to Sewage and <br />Aeration Pond <br />DOZER 1 10.25 $3,666
The URL can be used to link to this page
Your browser does not support the video tag.