Laserfiche WebLink
<br /> <br />COST SUMMARY WORK <br /> <br />Task description: Colowyo Renewal No. 8 <br />Site: Colowyo Coal Mine Permit Action: RN8 Permit/Job#: C1981019 <br /> <br />PROJECT IDENTIFICATION <br />Task #: 000 State: Colorado Abbreviation: None <br />Date: 8/16/2022 County: Moffat Filename: C019-000 <br />User: ZTT <br />Agency or organization name: DRMS <br /> <br />TASK LIST (DIRECT COSTS) <br />Task <br />Description <br />Form <br />Used <br />Fleet <br />Size <br />Task <br />Hours <br /> <br />Cost <br />001 Drill and Shoot South Taylor Highwall - Cast Blast <br />(3000 ft) <br />BLASTING 1 879.14 $1,381,065 <br />002 Load and Haul Spoil to TS-1 TRUCK1 1 1,078.51 $5,181,656 <br />003 Load and Haul Spoil to TS-2 TRUCK1 1 556.59 $2,417,287 <br />004 Load and Haul Spoil to TS-3 TRUCK1 1 310.99 $1,350,658 <br />005 Load and Haul Spoil to TS-4 TRUCK1 1 449.83 $1,746,068 <br />006 Load and Haul Spoil to TS-5 TRUCK1 1 134.66 $522,698 <br />007 Load and Haul Spoil to TS-6 TRUCK1 1 383.90 $1,490,152 <br />008 Load and Haul Spoil to TS-7 TRUCK1 1 753.43 $3,272,183 <br />009 Load and Haul Spoil to TS-8 TRUCK1 1 1,513.25 $6,572,099 <br />010 Load and Haul Spoil to TS-9 TRUCK1 1 1,298.12 $6,236,735 <br />011 Load and Haul Spoil to TS-10 TRUCK1 1 1,329.69 $6,388,428 <br />012 Load and Haul Spoil to TS-11 TRUCK1 1 1,148.55 $5,518,139 <br />013 Load and Haul Spoil to TS-12 TRUCK1 1 1,186.67 $5,153,773 <br />014 Load and Haul Spoil to TS-13 TRUCK1 1 1,173.66 $5,097,263 <br />015 Load and Haul Spoil to TS-14 TRUCK1 1 1,343.44 $5,834,627 <br />016 Load and Haul Spoil to TS-15 TRUCK1 1 1,295.19 $6,222,686 <br />017 Load and Haul Spoil to TS-16 TRUCK1 1 408.17 $1,772,716 <br />018 Load and Haul Spoil to TS-17 TRUCK1 1 408.17 $1,772,716 <br />019 Load and Haul Spoil to TS-18 TRUCK1 1 228.26 $886,013 <br />020 Load and Haul Spoil to TS-19 TRUCK1 1 71.35 $276,943 <br />021 Load and Haul Spoil to TS-20 TRUCK1 1 133.62 $580,338 <br />022 Load and Haul Spoil to TS-21 TRUCK1 1 197.26 $765,687 <br />023 Load and Haul Spoil to TS-22 TRUCK1 1 102.38 $397,419 <br />024 Regrade Gossard Loadout DOZER 4 2.36 $5,712 <br />025 Rip Facilities Area RIPPER 4 60.17 $149,718 <br />026 Rip Coal Stockpile Area RIPPER 4 10.36 $25,784 <br />027 Rip Gossard Loadout RIPPER 4 0.96 $2,401 <br />028 Rip Haul Road A and Haul Road B RIPPER 4 3.14 $7,830 <br />029 Regrade Haul Road A Upper and Lower Ditch DOZER 1 0.32 $184 <br />030 Rip Gossard Loadout Road RIPPER 4 1.26 $3,139 <br />031 Regrade Gossard Loadout Road DOZER 4 1.70 $4,130 <br />033 Reseed Road to Power Pole REVEGE 1 0.80 $232 <br />034 "Mine" Riprap from South Taylor Pit Temporary <br />Stockpiles for <br />SITEMAINT <br />ENANCE <br />1 0.00 $1,249,424 <br />035 Regrade Prospect Pond DOZER 1 34.19 $11,907 <br />036 Regrade Streeter Pond DOZER 1 77.75 $27,075 <br />037 Regrade Gossard Loop Pond DOZER 1 2.28 $795 <br />038 Regrade Rail Loop Pond DOZER 1 0.99 $345