Laserfiche WebLink
Cost Summary Worksheet Cont’d Task # 000 Page 6 of 6 <br /> <br />CIRCES Cost Estimating Software <br />453 Reseed Collom Facility Area REVEGE 1 251.00 $175,267 <br />459 Collom-Weed control 10% of 1133.4 ac. 3X REVEGE 1 120.00 $38,706 <br />460 Construct Collom Post-Mining Channels (TR154) NA 1 1,240.46 $236,680 <br />461 Plug and Seal All Wells for Collom (MR203) BOREHOLE 1 24.00 $18,174 <br />466 Plug and Seal 16 Geotechnical Boreholes BOREHOLE 1 24.00 $3,322 <br />468 Reseed Geotechnical Hole Access Corridors REVEGE 1 2.40 $1,465 <br />470 Plug and Seal 80 Collom In-Pit Drill Holes <br />(MR216) <br />BOREHOLE 1 949.00 $203,612 <br />471 Regrade Topsoil for Collom In-Pit Drill Pads DOZER 1 4.73 $2,940 <br />472 Regrade Topsoil for Collom In-Pit Drill Roads DOZER 1 2.08 $1,295 <br />473 Reseed Collom In-Pit Drill Pads and Roads REVEGE 1 11.20 $6,835 <br />474 Regrade Topsoil for Collom Power Line DOZER 1 11.58 $7,204 <br />475 Reseed 14.7 acres for Collom Power Line REVEGE 1 7.30 $17,943 <br />476 Regrade Ditch CWD-1 (MR202) DOZER 1 12.95 $3,036 <br />477 Regrade Topsoil for Ditch CWD-1 (MR202) DOZER 1 5.50 $3,146 <br />478 Reseed Ditch CWD-1 REVEGE 1 4.30 $2,491 <br />479 Reseed Collom Area Fire Lines REVEGE 1 2.50 $2,897 <br />480 Regrade Topsoil for Collom Haul Road Channels DOZER 1 1.43 $818 <br />481 Reseed Collom Haul Road Channels REVEGE 1 1.50 $2,057 <br /> <br /> <br /> <br />SUBTOTALS: <br /> <br /> <br />43221.15 <br /> <br />$138,260,940 <br /> <br />INDIRECT COSTS <br />OVERHEAD AND PROFIT: <br />Liability insurance: 2.02 Total = $2,792,871 <br />Performance bond: 1.05 Total = $1,451,740 <br />Job superintendent: 21,621.49 Total = $1,624,423 <br />Profit: 10.00 Total = $13,826,094 <br /> TOTAL O & P = $19,695,127 <br /> CONTRACT AMOUNT (direct + O & P) = $157,956,067 <br /> <br />LEGAL - ENGINEERING - PROJECT MANAGEMENT: <br />Financial warranty processing (legal/related costs): $500 Total = $500 <br />Engineering work and/or contract/bid preparation: 2.00 Total = $3,159,121 <br />Reclamation management and/or administration: 1.91 $3,016,961 <br /> <br />CONTINGENCY: 0.00 Total = $0 <br /> <br />TOTAL INDIRECT COST = $25,871,710 <br /> <br />TOTAL BOND AMOUNT (direct + indirect) = $164,132,650 <br />