Laserfiche WebLink
MR320 7East Pad Site Tent Structures 1/27/2022 $2,759.00 <br /> MR319 18LT Dewatering Borehole 8/6/2021 $20,828.00 <br /> TR9718 TR21-97 7E Cross Entries Borehole 10/5/2021 $36, 882.00 <br /> MR318 15 LT TUF Relocation 7/2/2021 none <br /> TR96 Removing omitted items from permit 8/5/2021 $1,100,095.74 <br /> SI3 Surety Increase No. 3 (SI-03) WD <br /> MT8 Midterm Review Findings Dated November 23, 11/23/2020 none <br /> 2020 <br /> TR95 Western Mine dewatering pipeline 12/18/2020 $15,400.00 <br /> MR317 Overland Belt Suspension Bridge 10/1/2020 $247.00 <br /> TR94 TR20-94 Refuse Pile Modification 11/21/2020 None <br /> MR316 Wetland Disturbance Boundary Modification 1/16/2020 $10,084.00 <br /> MR315 Passive Treatment Inlet Pipeline MOD 2 10/18/2019 $3,041.00 <br /> MR314 Passive Treatment Inlet Pipeline Route 8/5/2019 $3,229.00 <br /> Modification <br /> MR313 Thickener Pipeline Route Modification 5/8/2019 None <br /> MR312 Additional Booster Pump and Enclosure 3/22/2019 $7,927.00 <br /> TR93 Wash Plant Additional Thickener Tank Design 5/2/2019 -$11,771.73 <br /> Modification <br /> PR12 Wolf Creek Reserve LBA Development and WD None <br /> Mining <br /> TR92 Panel Extension 2/28/2019 None <br /> MR311 Second Thickener Pipeline and Refuse Bin 10/11/2018 $6,941.67 <br /> Modification <br /> TR91 Wash Plant Additional Thickener Tank System 11/8/2018 $75,058.73 <br /> MR310 Longwall Yard Storage Building 9/13/2018 $28,402.19 <br /> *No bond release applications have been submitted or approved since RN-07 <br /> Notice of Violations <br /> Notices of Violations which have been made to the Foidel Creek Mine permit since the last <br /> renewal (RN07) are listed below. <br /> No violations have been issued since the approval of RN-07. <br /> Surface Reclamation <br /> Foidel Creek Mine 15 August 4,2023 <br />