Laserfiche WebLink
6. Describe how roads will be reclaimed or returned to their pre-prospecting(or better) <br /> condition: <br /> The road surfaces and drill pads will be scarified and left in rough condition to hold <br /> seed and optimize germination. Roads we'! be regraded to direet run off to natural <br /> channels down gradient. Improved roads will be reclaimed to existing width of <br /> disturbance prior to prospecting. <br /> 7. List the seed mixture to be used in the re-establishment of vegetation. See the attached <br /> seed mixture calculation to obtain PLS/acre. For assistance with formulating seed <br /> mixtures and rates, contact the local NRCS if on private land, BLM/USFS if on public <br /> land or State Land Board if on state land. <br /> A. Plant name and seeding rate: <br /> Plant Name Seeding Rate (PLS/Acre) <br /> See Attachment 8 for the seed mix provided by the BLM. <br /> Form 2-Public File Page 10 or14 <br />