Laserfiche WebLink
B. Describe the method for seed bed preparation, and application method for <br /> grass/forb seeding: <br /> The final surface of backfilled sumps and scarified travel lanes will have stockpiled <br /> seed and optimize germination. Reclaimed areas will be hand-broadcast seeded with <br /> the BLM approved seed mix. Seeding will be completed at the appropriate time of year <br /> as advised by BLM staff. Fimal revegetatiom will be eamsistent with post expleratiam land <br /> uses. <br /> V. TERMS AND CONDITIONS FOR PROSPECTING OPERATIONS: <br /> 1. Reclamation measures shall be fulfilled in a timely manner and completed within five <br /> (5) years of completion of prospecting activities. <br /> 2. The prospecting operations described in this Notice will be conducted in such a <br /> manner as to minimize surface disturbances. In addition to the measures required in <br /> Rine 5, precautions to be taken include: <br /> A. Confinement of operations to areas near existing roads or trails, where <br /> practicable. Existing roads which are to remain as permanent roads after <br /> prospecting activities are completed shall be left in a condition equal to or better <br /> than the pre-prospecting condition; <br /> B. Drilling shall be conducted in such a way as to prevent cuttings and fluids from <br /> directly entering any dry or flowing stream channel. Drill cuttings must be spread <br /> to a depth no greater than one-half(1/2) inch or buried in an approved disposal <br /> pit; <br /> C. Proper and timely abandonment of drill holes upon completion of drilling; <br /> D. Reclamation of affected lands upon completion of operations or phases of an <br /> operation;, <br /> E. Backfilling and revegetating any pits to blend in with the surrounding land <br /> surface; <br /> Form 2-Public File Page 11 of 14 <br />