Laserfiche WebLink
3. Describe the estimated topsoil depth and how topsoil will be salvaged, stockpiled and <br /> redistributed for the re-establishment of vegetation. Specify approximate topsoil <br /> redistribution depth: <br /> Topsoil is estimated to be minimal. Topsoil present in the areas of the proposed road, <br /> and pad surfaces will e stripped and stored along the edges of disturbance to a ow or <br /> redistribution. Width of disturbance for proposed roads will be 14 feet to allow for a <br /> topsoil berm along the road. When the topsoil is redistributed over the surfaces, the <br /> 4. Describe how drill holes will be plugged (refer to Rule 5.4 of the Rules for required <br /> abandonment procedures): <br /> Drill holes will be plugged in accordance with Mineral Rules and Regulations of the <br /> Colorado ine an ec ama ion Board. Each drillo will be permanently plugged, <br /> sealed, or capped before the rig moves from each drill site. Drill holes with artesian flow <br /> will be plugged with neat cement grout or similar material. A final report will be <br /> subr,iitted ,io late, than sixty (60) days afte, t!ie abdi idoi n i iei it of di ill 1 oles YOU <br /> artesian flow at the surface or no later than twelve 12 months after abandonment of <br /> any other dr II holes. The report will contain information as stated lin Rule 5.7. Artesian <br /> 5. Describe how portals, adits, shafts, ponds, excavations, or other disturbances will be <br /> reclaimed (refer to Rule 3 and Rule 5 for specific reclamation performance standards). <br /> You may wish to contact the Division for closure specifications. <br /> Mud pits located within drill pads will be backfilled and the surface reclaimed along with <br /> e drill pa . <br /> Forin 2-Public File Page 9 of 14 <br />