MINING PLAN(CONT) EXHIBIT C <br /> stripped material may be placed directly on the seedbed, if it will <br /> not be redisturbed. <br /> Mining will start on the southeast side near where the road <br /> enters the permit area. The plan is to begin mining into the <br /> hillside working north and west creating a floor where processing <br /> and stockpiling will take place. This will create an amphitheater <br /> like basin in the hillside as mining progresses and when mining <br /> ends . The east, north and west slopes that are not daylighted out <br /> will be graded 2h: 1v and the south slope below the mine floor will <br /> remain in its natural state. No blasting will take place in this <br /> mine. <br /> When topsoil is encountered, it will be stripped and stockpiled <br /> around the perimeter of the site or on the mine floor for use in <br /> reclamation. An average of six (6) inches of salvaged growth medium <br /> will be placed on the mined area. If the soil stockpiles remain <br /> undisturbed for more than one growing season it will be temporarily <br /> seeded using the approved seed mix at the proposed rate shown on <br /> page 18 . <br /> Once the mine is opened by stripping the top 6 inches of <br /> material, mining will begin by using a dozer (s) to push the material <br /> into piles for loading into the processing plant or for removal as <br /> pit run material . The working slope will be cut at its final rate <br /> of 2h to lv as mining progresses so only resoiling would be needed <br /> if mining ended before the site is mined out . This sloped working <br /> face will stretch across the permit from east to west as mining <br /> works north into the deposit . From the 10 foot setback line a 2h to <br /> lv slopes will be constructed into the mine. This will reclaim and <br /> stabilize the slopes into the mine as mining progresses . <br /> Processing done on site will be done using portable equipment <br /> that is moved to the mine as needed. Processing will be done to <br /> build material stockpiles that will be removed as needed. The <br /> processing plant will be placed close to the mine' s working face <br /> each time it is moved in, so the Plant Site and stockpile area will <br /> follow mining. Mining will be done by using front-end loaders to <br /> mine into the hillside to create the floor. It will then be loaded <br /> into the processing plant or trucks with the loader. As the deposit <br /> deepens the operator will begin to push material from the upper <br /> reaches of the mine to the floor along a 2h to lv slope. <br /> The sloping will be done as mining progresses so no backfilling <br /> will be needed to create the final 2 : 1 grade. Grading and shaping <br /> will run concurrent with mining so that if mining ended prematurely <br /> only 700 feet or less of the working face would need final grading, <br /> and resoiling, as shown on MINING PLAN MAP-EXHIBIT E-2 <br /> W.F. RATLIFF-East Sand Canyon Mine 24 June 1, 2023 <br />