Laserfiche WebLink
Exhibit L Reclamation Costs (cont) <br /> Unit Costs Used In Estimate <br /> Task Description Direct Cost <br /> 001 - Revegetation - per acre $850.00 <br /> 002 - Replace Topsoil - Cat 627G -and scraper team- per cubic yard <br /> Haul distance 900 feet or less $0.824 <br /> 003 - Cat 140H blade Rip seed beds per acre $99.00 <br /> 004 - Cat 140H blade Grade and shape per acre. $93.00 <br /> 005 - Backfill Ponds 1 using a Cat 627G and scraper team - per cubic <br /> yard Haul distance 500 feet or less S0.824 <br /> 006a - Concrete demo per yard $7.00 <br /> 0076 - Secondary seeding per acre $212.00 <br /> 008 - Weed Control per year 007--v eb/de fAeb Haul 5 <br /> a:.anee�.0-mi;e <br /> aver-age --speed 50 FAphO $5000.004—AW g <br /> 009- Mob/demob - Haul distance 5.0 miles <br /> average speed 50 mph $6406.485,00 <br /> 010 - Bank till usiny�a Cat 6276 and scraper team- per cubic yard Haul <br /> distance 500 feet or less S 1.25 <br /> 01 1 Slurry wall Installation per face foot 55.00 <br /> O1 r armorinj with Broken Concrete, placed per toot <br /> 85 <br />